Skip to content

DERC · Delhi Electricity Regulatory Commission

Draft Renewable Purchase Obligation and REC Framework Implementation Regulations, 2011 — Explanatory Memorandum

Explanatory Memorandum for Draft DERC Regulations, 2011

Explanatory memorandum to a draftDated 30 Jun 2011

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Renewable Purchase Obligation and Renewable Energy Certificate Framework Implementation Regulations, 2011 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The memorandum explains why the Delhi Electricity Regulatory Commission proposed to impose renewable purchase obligations in Delhi and to connect the State to the national Renewable Energy Certificate market. Pages 1–2 set the context: Delhi's demand is met largely from conventional sources, renewable potential (solar, biomass, cogeneration, municipal waste) is barely tapped, and the Electricity Act 2003 (ss.3(1), 61(h), 86(1)(e), 66) together with the National Electricity Policy, Tariff Policy, NAPCC and JNNSM require SERCs to promote renewables and fix purchase percentages (p1–4).

Pages 4–5 explain the need for RECs — they let obligated entities in resource-poor States meet RPO by buying certificates rather than energy — and set out the RPO trajectory proposed for the State: a combined non-solar target plus a separate, smaller solar target, rising annually to 2017, drawing on a Forum of Regulators study (p5).

Pages 5–7 summarise the four blocks of the draft Regulations: (i) RPO and its compliance — who is obligated, the choice between preferential tariff and RECs, the RPO Regulatory Fund for shortfalls, exemption from cross-subsidy surcharge for RES open-access supply, and no banking (p5–6); (ii) the REC mechanism, adopting the CERC framework of solar and non-solar certificates (p7); (iii) the State Agency's accreditation, registration-recommendation, monitoring and reporting functions, and its replacement if unsatisfactory (p7); and (iv) miscellaneous matters — priority open access for RE generators and appointment of compliance auditors (p7).

Annexures 1–4 (pp8–11) reproduce National Electricity Policy para 5.12, Tariff Policy clause 6.4, the salient features of the national REC framework, and of the CERC REC Regulations 2010, which supply the scaffolding for the draft.

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Renewable energy tariff

Read with this

Voltaic holds no final regulation made from this draft.

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document