Skip to content

KERC · Karnataka Electricity Regulatory Commission

Karnataka Electricity Distribution Code (KEDC), 2025

KERC (Karnataka Electricity Distribution Code) Regulations, 2025

CodeDated 17 Jul 2025Published in the Gazette 21 Jul 2025KERC/KEDC/2025-26/513 dated 17.07.2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software, from pages 1 to 38 of 65. Check the regulator's original before you rely on it.

The Karnataka Electricity Regulatory Commission has issued the KERC (Karnataka Electricity Distribution Code) Regulations, 2025 — commonly the KEDC 2025 — through notification KERC/KEDC/2025-26/513 dated 17 July 2025 (p1). The Code is presented as a revision of the earlier Distribution Code, 2015 notified on 03.02.2016, and as a response to CERC’s Indian Electricity Grid Code Regulations, 2023 and a set of CEA technical, metering, safety, communication and distribution-planning instruments listed in the preamble (p3–4). A draft 2024 version was issued for stakeholder comments and a public hearing was held on 08.04.2025 (p4).

The Code extends to the whole of Karnataka and comes into force from the date of publication in the official Gazette (p5); the Gazette page shows 21 July 2025 (p1). It is made under s.181(2)(zp) read with s.42(1) of the Electricity Act, 2003 (p3, p5). The contents list at pp1–2 maps the short-title clause, definitions, five chapters and the planning, operation and miscellaneous provisions.

Chapter 1 defines terms and gives residual meanings from the Grid Code and the Act (p5–8). Chapter 2 sets scope and objectives, applicability, implementation, confidentiality, constitution and functions of the BESCOM-coordinated Distribution Code Review Panel (DCRP), management of the Code, unforeseen circumstances and non-compliance consequences (p8–13). Chapter 3 is the Distribution Planning Code: planning objectives, system construction and security planning, planning procedure and standards, energy audit responsibilities, construction and safety standards, harmonic distortion and voltage regulation, design criteria for lines, reliability indices and reporting, distribution transformer standardisation and O&M, Quality Assurance Plan requirements, substation and DTC layouts, reactive power compensation, service mains and metering arrangements (p13–38). Chapters 4 and 5 are listed in the contents (p1–2) but their operative text is beyond page 38: Chapter 4 covers the Distribution Operation and Maintenance Code, including DCCs, outage and contingency planning, load shedding, interface with small generating units and CGPs, metering and protection, communication, O&M, inspection; Chapter 5 covers power to relax, power to remove difficulty, repeal and savings, and suo-motu orders or practice directions.

Standard name
Distribution Code
Primary topics
Distribution system planning and operation, Technical standards, Metering

Read with this

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document