KERC · Karnataka Electricity Regulatory Commission
Karnataka Electricity Distribution Code — First Amendment, 2026 — Draft
Karnataka Electricity Regulatory Commission (Karnataka Electricity Distribution Code) (First Amendment), 2026
Draft amendmentDated 4 Jun 2026KERC/KEDC/2026-27/2080 dated 04.06.2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft notification in which the Karnataka Electricity Regulatory Commission proposes the first set of amendments to the Karnataka Electricity Distribution Code, 2025. Pages 1–2 give the Commission's reasons: representations from a switchgear manufacturer and a consumer association about redundant vendor approvals, a suggestion at the 72nd Advisory Committee Meeting (22.09.2025) that vendor approval obtained in one ESCOM should suffice across the State, and CEA's revised Model Quality Assurance Plan guidelines (January 2026) and O&M benchmarking guidelines (January 2025), which removed the vendor approval process. The Commission proposes to act under clauses 5.1 and 5.2 of the KEDC, and invites comments by 24 June 2026 (p2).
The operative draft is a two-column table (pp3–8) showing existing clauses alongside amended text. It touches the Distribution Planning Code's objectives and planning procedure (clauses 3.1(iv), 3.3, 3.4(a)(ix)), the list of statutory instruments the distribution system must conform to, standardization of distribution transformer design (3.11(1)), the quality assurance regime (3.12), and the Commission's power to relax (5.1).
The biggest change is in clause 3.12: the requirement to procure only from utility-approved vendors is deleted, replaced by equipment failure-rate norms in tender documents, utility reporting of failure rates, and blacklisting of repeat-failing suppliers. New sub-clauses add pre-dispatch inspection, risk-based sampling, field quality plans, responsibility for sample handling and post-commissioning testing costs, and third-party-audited quality checks on completed works. Type tests and routine tests are to follow relevant Indian Standards, with an equipment-wise validity table. Clause 5.1 gains a general power to amend the regulations.
Read with this
The regulation
- Dated 17 Jul 2025Karnataka Electricity Distribution Code (KEDC), 2025
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.