Skip to content

KERC · Karnataka Electricity Regulatory Commission

Karnataka Electricity Distribution Code — First Amendment, 2026 — Draft

Karnataka Electricity Regulatory Commission (Karnataka Electricity Distribution Code) (First Amendment), 2026

Draft amendmentDated 4 Jun 2026KERC/KEDC/2026-27/2080 dated 04.06.2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft notification in which the Karnataka Electricity Regulatory Commission proposes the first set of amendments to the Karnataka Electricity Distribution Code, 2025. Pages 1–2 give the Commission's reasons: representations from a switchgear manufacturer and a consumer association about redundant vendor approvals, a suggestion at the 72nd Advisory Committee Meeting (22.09.2025) that vendor approval obtained in one ESCOM should suffice across the State, and CEA's revised Model Quality Assurance Plan guidelines (January 2026) and O&M benchmarking guidelines (January 2025), which removed the vendor approval process. The Commission proposes to act under clauses 5.1 and 5.2 of the KEDC, and invites comments by 24 June 2026 (p2).

The operative draft is a two-column table (pp3–8) showing existing clauses alongside amended text. It touches the Distribution Planning Code's objectives and planning procedure (clauses 3.1(iv), 3.3, 3.4(a)(ix)), the list of statutory instruments the distribution system must conform to, standardization of distribution transformer design (3.11(1)), the quality assurance regime (3.12), and the Commission's power to relax (5.1).

The biggest change is in clause 3.12: the requirement to procure only from utility-approved vendors is deleted, replaced by equipment failure-rate norms in tender documents, utility reporting of failure rates, and blacklisting of repeat-failing suppliers. New sub-clauses add pre-dispatch inspection, risk-based sampling, field quality plans, responsibility for sample handling and post-commissioning testing costs, and third-party-audited quality checks on completed works. Type tests and routine tests are to follow relevant Indian Standards, with an equipment-wise validity table. Clause 5.1 gains a general power to amend the regulations.

Standard name
Distribution Code
Primary topics
Distribution system planning and operation, Technical standards

Read with this

The regulation

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document