Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for Determination of Conventional Generation Tariff) Regulations, 2026
Draft regulationDated 1 Jun 2026TNERC/TR-CGT/2026/...... dated 01-06-2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft TNERC regulation published for consultation on 01-06-2026, with comments invited by 17-06-2026 (p1). It is framed to supersede the 2005 tariff regulations for conventional generating stations and to establish a multi-year tariff framework for the control period FY 2027-28 to FY 2031-32, with annual performance review, mid-term review and true-up (pp4–5, 19–29).
Chapter 1 sets the title, scope, commencement and definitions. It applies to conventional stations under operation or reaching COD on or after 01-04-2027, excludes stations whose tariff is discovered through s.63 competitive bidding and renewable/non-conventional stations covered by separate 2026 regulations, and preserves the 2005 framework for true-up and APR up to FY 2026-27 (pp4–18, 28–29). Chapter 2 lays out the tariff framework: stage/unit-wise determination, application and provisional/final tariff process, in-principle approval for large additional capex, carrying cost, and the three petition tracks — MYT, mid-term review, and true-up/APR — with filing deadlines and formats (pp19–29).
Chapter 3 governs capital investment plans, capital cost recognition and prudence check, IDC/IEDC, controllable and uncontrollable factors, initial spares, additional capitalisation (including R&M, emission-control capex and IBC-acquired projects), infirm power, debt-equity and BESS exclusion (pp30–53). Chapter 4 sets the annual fixed cost building blocks: return on equity, tax gross-up, interest on loan, depreciation, working capital, O&M and non-tariff income (pp54–70). Chapter 5 builds energy charges from landed fuel cost, transit and handling losses, GCV and reagent cost (pp71–74). Chapter 6 gives monthly capacity-charge and energy-charge formulae for thermal, supplementary emission-control, hydro and BESS-related charges (pp75–85).
Chapter 7 sets ceiling operational norms for thermal and hydro stations — availability, heat rate, secondary fuel oil, auxiliary consumption, reagent consumption, part-load compensation, biomass co-firing and hydro availability (pp86–101). Chapter 8 covers scheduling, declared-capability demonstration, metering, billing and statutory-charge recovery (pp102–104). Chapter 9 sets sharing of controllable gains, refinancing savings and non-tariff income (pp105–107). Chapter 10 contains miscellaneous provisions: ceiling tariff, deviations, forex hedging, incentive, deviation charges, rebate, late payment surcharge, fees, orders and practice directions, relaxation, savings and dispute resolution (pp108–115). Annexure-1 gives the depreciation schedule (pp116–118); the tariff formats run from pp119–259; the Statement of Reasons explains the need for and salient features of the draft (pp260–263).
Read with this
The regulation
- Dated 19 Jul 2002Tariff Regulations 2002
Proposed changes (drafts with no final yet)
- Dated 13 Jan 2016Intra State Availability Based Tariff Regulations, 2016 — Draft
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.