Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Conventional Generation Tariff Regulations, 2026 — Draft

Tamil Nadu Electricity Regulatory Commission (Terms and Conditions for Determination of Conventional Generation Tariff) Regulations, 2026

Draft regulationDated 1 Jun 2026TNERC/TR-CGT/2026/...... dated 01-06-2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft TNERC regulation published for consultation on 01-06-2026, with comments invited by 17-06-2026 (p1). It is framed to supersede the 2005 tariff regulations for conventional generating stations and to establish a multi-year tariff framework for the control period FY 2027-28 to FY 2031-32, with annual performance review, mid-term review and true-up (pp4–5, 19–29).

Chapter 1 sets the title, scope, commencement and definitions. It applies to conventional stations under operation or reaching COD on or after 01-04-2027, excludes stations whose tariff is discovered through s.63 competitive bidding and renewable/non-conventional stations covered by separate 2026 regulations, and preserves the 2005 framework for true-up and APR up to FY 2026-27 (pp4–18, 28–29). Chapter 2 lays out the tariff framework: stage/unit-wise determination, application and provisional/final tariff process, in-principle approval for large additional capex, carrying cost, and the three petition tracks — MYT, mid-term review, and true-up/APR — with filing deadlines and formats (pp19–29).

Chapter 3 governs capital investment plans, capital cost recognition and prudence check, IDC/IEDC, controllable and uncontrollable factors, initial spares, additional capitalisation (including R&M, emission-control capex and IBC-acquired projects), infirm power, debt-equity and BESS exclusion (pp30–53). Chapter 4 sets the annual fixed cost building blocks: return on equity, tax gross-up, interest on loan, depreciation, working capital, O&M and non-tariff income (pp54–70). Chapter 5 builds energy charges from landed fuel cost, transit and handling losses, GCV and reagent cost (pp71–74). Chapter 6 gives monthly capacity-charge and energy-charge formulae for thermal, supplementary emission-control, hydro and BESS-related charges (pp75–85).

Chapter 7 sets ceiling operational norms for thermal and hydro stations — availability, heat rate, secondary fuel oil, auxiliary consumption, reagent consumption, part-load compensation, biomass co-firing and hydro availability (pp86–101). Chapter 8 covers scheduling, declared-capability demonstration, metering, billing and statutory-charge recovery (pp102–104). Chapter 9 sets sharing of controllable gains, refinancing savings and non-tariff income (pp105–107). Chapter 10 contains miscellaneous provisions: ceiling tariff, deviations, forex hedging, incentive, deviation charges, rebate, late payment surcharge, fees, orders and practice directions, relaxation, savings and dispute resolution (pp108–115). Annexure-1 gives the depreciation schedule (pp116–118); the tariff formats run from pp119–259; the Statement of Reasons explains the need for and salient features of the draft (pp260–263).

Standard name
Generation Tariff Regulations, Multi Year Tariff Regulations
Primary topics
Generation tariff, Multi Year Tariff (MYT), Tariff determination

Read with this

The regulation

Proposed changes (drafts with no final yet)

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document