TNERC · Tamil Nadu Electricity Regulatory Commission
Intra State Availability Based Tariff Regulations, 2016 — Draft
Tamil Nadu Electricity Regulatory Commission (Intra State Availability Based Tariff) Regulations, 2016
Draft regulationDated 13 Jan 2016TNERC/ABT/ dated dt. .1.2016
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Commission issues draft Intra State Availability Based Tariff Regulations, 2016 for comment, with a draft notification inviting comments/suggestions by 13.2.2016 (p1). The regulations are to commence on publication in the Tamil Nadu Government Gazette; no Gazette date is printed (p1). Sections 1–2 set title, commencement and definitions for ABT, deviation, sellers/buyers, SLDC accounts, time block and users (p1–4). Section 3 makes intra-State ABT applicable to generating stations other than those under inter-State ABT, nuclear, hydro including pumped storage and merchant plants, and to distribution/trading licensees and intra-State open access customers; it is suspended during grid disturbance or islanded operation (p4–5). It allocates scheduling/accounting between RLDC and SLDC depending on CTU or State/distribution connection (p5).
Section 4 specifies the three ABT components — capacity/fixed, energy/variable and deviation — with capacity and energy charges per Commission regulations/orders and deviation charges under the CERC DSM Regulations 2014; wind and solar deviations are left to separate Commission regulations/orders (p5–6). Section 5 covers reactive power compensation, VAr pricing and SLDC directions (p6–7). Sections 6–8 deal with scheduling, gaming inquiries and metering/interface meters (p8).
Sections 9–10 set the energy-accounting and commercial-settlement architecture: SLDC prepares the State Energy Account and maintains imbalance/deviation and reactive-energy pool accounts, with verification by a State Power Committee; they also specify billing, deviation and VAr statements, payment security, late-payment interest, pool balancing, surplus VAr funds and quarterly statements (p8–12). Section 11 requires SLDC to build monitoring, communication, software and staffing capability (p12–13); Sections 13–14 give the Commission powers to remove difficulties and amend the regulations (p13). The Explanatory Statement grounds the draft in the National Electricity Policy, Tariff Policy, CERC's inter-State ABT/DSM experience and the need for State-level grid discipline (p14–16).
Read with this
The regulation
- Dated 19 Jul 2002Tariff Regulations 2002
Proposed changes (drafts with no final yet)
- Dated 1 Jun 2026Conventional Generation Tariff Regulations, 2026 — Draft
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.