This is a prescribed workbook of tariff-filing forms for an integrated coal/lignite mine — what a generating company with its own, or MDO-operated, captive mine must submit to have the input price of coal determined before the Commission. It is forms, not substantive standards: each cost element has a named form, and the elements themselves are defined by the Commission's input-price regulations.
Pages 1–4 are the filing pack: a checklist of the main forms (Form 1 to Form 18), a checklist of supporting forms (Form B to Form N), a list of supporting documents (incorporation papers, mine-wise and corporate audited accounts, loan agreements, equity and foreign-equity approvals, end-use plant list, cost audit report), and the e-filing instruction — petition in Word, computations in Excel, sent by e-mail and on pen drive (p4).
Forms 1, 1A and 1B (pp5–8) are the operative summaries. Input price per tonne is built from ROM cost, additional charges and statutory charges; ROM cost is total annual extraction cost (depreciation, interest on loan, return on equity, working-capital interest, O&M excluding mining charge, mine-closure expense) divided by annual target quantity, plus mining charge and fixed reserve price. Additional charges cover crushing, transportation (split at washery/CHP ends), handling and washing, whether done departmentally or through agencies.
Forms 2–3A (pp9–13) collect the claimed capital base, return on equity, O&M and the normative parameters used in the computation. Forms 4 and 4A (pp14–16) capture foreign loans and foreign equity with drawl, hedging and exchange-rate detail. Forms 6–18 (pp17–37) cover admitted capital cost, the financial package, mine-specific and allocated corporate loans, additional capitalization and its financing, depreciation per OERC's schedule, weighted average interest on actual loans, the IDC/financing-charge drawdown schedule, non-tariff income, statutory charges, mine-closure escrow recovery and GCV adjustment.
Supporting Forms B–N and the statements at pp38–56 supply the audit trail: capital cost estimates against actuals with variation reasons, package-wise awards, de-capitalization, reconciliation of claimed capitalization with the books (Ind AS versus Indian GAAP), exclusion claims, capital cost and CWIP statements, interest on normative loan and working capital, incidental expenditure up to COD, actual cash expenditure and liability flow. The forms run across the 2024-29 tariff period, with several schedules expressly deferred to true-up. No notification number, issue date or gazette reference is printed.
Read with this
The regulation
- Date not statedIntegrated Mine Coal Input Price Regulations, 2024
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.