Tariff Filing Forms (Integrated Mine) for Input Price Determination

TARIFF FILING FORMS (INTEGRATED MINE) FOR DETERMINATION OF INPUT PRICE

OrderDate not stated

Made under the Integrated Mine Coal Input Price Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a prescribed workbook of tariff-filing forms for an integrated coal/lignite mine — what a generating company with its own, or MDO-operated, captive mine must submit to have the input price of coal determined before the Commission. It is forms, not substantive standards: each cost element has a named form, and the elements themselves are defined by the Commission's input-price regulations.

Pages 1–4 are the filing pack: a checklist of the main forms (Form 1 to Form 18), a checklist of supporting forms (Form B to Form N), a list of supporting documents (incorporation papers, mine-wise and corporate audited accounts, loan agreements, equity and foreign-equity approvals, end-use plant list, cost audit report), and the e-filing instruction — petition in Word, computations in Excel, sent by e-mail and on pen drive (p4).

Forms 1, 1A and 1B (pp5–8) are the operative summaries. Input price per tonne is built from ROM cost, additional charges and statutory charges; ROM cost is total annual extraction cost (depreciation, interest on loan, return on equity, working-capital interest, O&M excluding mining charge, mine-closure expense) divided by annual target quantity, plus mining charge and fixed reserve price. Additional charges cover crushing, transportation (split at washery/CHP ends), handling and washing, whether done departmentally or through agencies.

Forms 2–3A (pp9–13) collect the claimed capital base, return on equity, O&M and the normative parameters used in the computation. Forms 4 and 4A (pp14–16) capture foreign loans and foreign equity with drawl, hedging and exchange-rate detail. Forms 6–18 (pp17–37) cover admitted capital cost, the financial package, mine-specific and allocated corporate loans, additional capitalization and its financing, depreciation per OERC's schedule, weighted average interest on actual loans, the IDC/financing-charge drawdown schedule, non-tariff income, statutory charges, mine-closure escrow recovery and GCV adjustment.

Supporting Forms B–N and the statements at pp38–56 supply the audit trail: capital cost estimates against actuals with variation reasons, package-wise awards, de-capitalization, reconciliation of claimed capitalization with the books (Ind AS versus Indian GAAP), exclusion claims, capital cost and CWIP statements, interest on normative loan and working capital, incidental expenditure up to COD, actual cash expenditure and liability flow. The forms run across the 2024-29 tariff period, with several schedules expressly deferred to true-up. No notification number, issue date or gazette reference is printed.

Primary topics
Tariff determination, Capital cost and investment, Return, financing and working capital

Read with this

The regulation

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗