OERC · Odisha Electricity Regulatory Commission
Integrated Mine Coal Input Price Regulations, 2024
Determination of Input Price of Coal from Integrated Mine Regulations, 2024
RegulationDate not stated
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Odisha Electricity Regulatory Commission's framework for pricing coal that a generating company draws from an integrated coal mine, so that the fuel cost can be fed into the energy charge determined under the Commission's generation tariff regulations. It applies to generating companies holding a Fuel Supply Agreement for coal from an integrated mine serving specified end-use stations whose tariff the Commission fixes under s.62 read with s.86 of the Electricity Act (p2).
After applicability, objective and a long definitions section (p2–7), it requires the Allottee Company to petition for determination of the input price within 90 days of the mine's date of commercial operation or of the notification of the regulations (p7). The following regulation sets the two building blocks — ROM coal cost and additional charges (crushing, in-mine transport, handling, washing and transport to the loading point) plus statutory charges — and allows provisional billing at the lower of CIL's notified price or the investment-approval estimate until the Commission determines the price, with subsequent refund/recovery plus SBI one-year MCLR interest in six instalments, and denial of carrying cost where the petition is late (p8–9).
Regulation 6 gives separate ROM cost formulae for mines allocated by allotment and by auction under the Coal Mines (Special Provisions) Act, 2015, including treatment of mining charge, fixed reserve price and auction premium (p9–10). Regulation 7 covers how additional charges are computed when the Allottee Company performs the work itself versus when it sits inside the Mine Developer and Operator's scope (p10–11). Regulation 8 handles coal supplied before COD (p11–12), Regulation 9 the FY 2024-29 true-up (p12) and Regulation 10 the link to the energy charge under the OERC Generation Tariff Regulations, 2020 (p12).
The middle of the document is a cost-recognition code: capital cost (Reg 11, p13), additional capital expenditure and what is excluded (Reg 12, p13–15), annual extraction cost components (Reg 13, p15), debt:equity, return on equity and interest on loan (Reg 14, p16–18), depreciation (Reg 15, p18–19 with Appendix A at p29), O&M (Reg 16, p19), working capital (Reg 17, p20) and mine closure through the escrow account (Reg 18, p20–22).
Regulation 19 gives the input-price formula and Regulation 20 the recovery formula, with the rule that where the energy charge rate based on mine coal exceeds the CIL-notified-price ECR by more than 20% in a month, beneficiary consent is required (p22). Regulations 21–24 provide overburden, GCV and non-tariff-income adjustments and the credit adjustment note mechanism (p22–25). Regulation 25 requires third-party quality sampling at the loading point (p25). Regulations 26–27 set rebate and late-payment surcharge, subject to any different FSA mechanism (p26). Regulation 28 makes the determined input price a ceiling (p26–27), and Chapter 3 (Regs 29–32) gives the Commission powers to direct, relax, amend and remove difficulties (p28).
Read with this
Procedures and orders made under it
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.