GERC · Gujarat Electricity Regulatory Commission

Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — First Amendment, 2010

Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing supply and other Miscellaneous Charges)(First Amendment) Regulations, 2010

AmendmentDated 5 Mar 2010NOTIFICATION NO.2 of 2010 dated 5/3/2010

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's First Amendment to its 2005 regulations on a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges, issued as Notification No. 2 of 2010 (p1). It is a single-substitution amendment: Section 2 replaces clause 4.2(i) of the principal Regulations with new text on how a distribution licensee estimates and recovers the cost of electrical plant for Low Tension connections (p1–2).

The substituted clause sets out a cost-estimation method: the licensee computes the cost of the distribution transformer with switchgear, divides it by the rated capacity of the DTR in kVA to obtain cost per kVA, and multiplies by a factor 'K' to arrive at the amount payable by the applicant (p1–2). Where an existing plant's capacity is augmented, the differential cost between the existing and the new plant forms the basis for pro-rata charges, and the licensee continues to estimate amounts payable by subsequent applicants on that basis until the full cost of the transformer is recovered (p2). All estimates must be based on the latest cost data published by the distribution licensee (p2).

Section 1 gives the short title and commencement: the Regulations come into force on the date of their publication in the Gazette, though no Gazette date is printed. The notification is dated 5 March 2010, while the Secretary's sign-off block carries an earlier date of 16 February 2010 and the place Ahmedabad (p1–2).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges

Read with this

Voltaic does not hold the regulation itself.

Commencement notices and reasons

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.