GERC · Gujarat Electricity Regulatory Commission
Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — First Amendment, 2010
Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing supply and other Miscellaneous Charges)(First Amendment) Regulations, 2010
AmendmentDated 5 Mar 2010NOTIFICATION NO.2 of 2010 dated 5/3/2010
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's First Amendment to its 2005 regulations on a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges, issued as Notification No. 2 of 2010 (p1). It is a single-substitution amendment: Section 2 replaces clause 4.2(i) of the principal Regulations with new text on how a distribution licensee estimates and recovers the cost of electrical plant for Low Tension connections (p1–2).
The substituted clause sets out a cost-estimation method: the licensee computes the cost of the distribution transformer with switchgear, divides it by the rated capacity of the DTR in kVA to obtain cost per kVA, and multiplies by a factor 'K' to arrive at the amount payable by the applicant (p1–2). Where an existing plant's capacity is augmented, the differential cost between the existing and the new plant forms the basis for pro-rata charges, and the licensee continues to estimate amounts payable by subsequent applicants on that basis until the full cost of the transformer is recovered (p2). All estimates must be based on the latest cost data published by the distribution licensee (p2).
Section 1 gives the short title and commencement: the Regulations come into force on the date of their publication in the Gazette, though no Gazette date is printed. The notification is dated 5 March 2010, while the Secretary's sign-off block carries an earlier date of 16 February 2010 and the place Ahmedabad (p1–2).
Read with this
Voltaic does not hold the regulation itself.
Commencement notices and reasons
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.