JSERC · Jharkhand State Electricity Regulatory Commission

Determination of Tariff for Procurement of Power from Wind, Biogas, Municipal Solid Waste and Refuse Derived Fuel based Power Projects Regulations, 2016

Jharkhand State Electricity Regulatory Commission (Determination of Tariff for Procurement of Power from Wind, Biogas, Municipal Solid waste and Refuse Derived fuel based Power Projects) Regulations, 2016

RegulationDated 28 Sep 2016Published in the Gazette 8 Dec 2016Notification No. 59 dated 28.09.2016

2 amendments to it are on Voltaic, the latest dated 25 Jun 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the JSERC's principal regulation for pricing power that Jharkhand's distribution licensees buy from wind, biogas, municipal solid waste (MSW) and refuse-derived-fuel (RDF) projects, and the framework developers use to get a tariff and sign a PPA. It was made under s.86(1)(a)–(c) read with (e), s.61(a)–(h) and s.62(1) of the Electricity Act 2003, issued by Notification No. 59 dated 28.09.2016 and published in the Jharkhand Gazette Extraordinary of 8 December 2016 (p1). It extends to the whole State and comes into force on gazette publication, remaining in force up to 31 March 2020 unless reviewed or extended (p1).

Part A3 fixes who and what is covered: only grid-connected projects using new plant and machinery — new wind turbine generators, 100% biogas-fired engines, or Rankine-cycle MSW and RDF plants — with a control period of 1 April 2016 to 31 March 2020, and a roll-over rule that keeps these norms applying until revised regulations are notified (p5).

Part A4 is the substance. It separates stand-alone projects supplying notified rural areas (no tariff determined) from grid-feeding projects needing a Commission-determined tariff so PPAs can be signed; sets generic tariff periods of 25 years for wind and 20 years for the other three technologies for projects commissioned up to 31 March 2020; provides for annual suo-motu generic tariffs and, optionally, project-specific tariff on petition where all financial norms except capital cost act as ceilings (p5–7). It then lays down the cost-plus building blocks technology by technology: capital cost with a WPI-based indexation formula and default constants; wind CUF bands by wind power density at 80 m hub height with C-WET-validated zoning; PLF for biogas, MSW and RDF; auxiliary consumption; plant life; debt-equity ratio; loan tenure, interest on long-term debt and on working capital (both linked to the SBI base rate); the depreciation approach; O&M expenses with annual escalation; pre-tax return on equity; and fuel cost with an optional fuel-price indexation formula for biogas and an escalation option for RDF. Tariff is single-part with fixed and fuel components on a levellised basis, with no fuel component for MSW (p7–17). Table 5 consolidates these parameters (p16–17).

Part A5 covers commercial terms: transmission and wheeling charges/losses per open-access determinations for third-party sale and captive use; must-run treatment for non-wind RE of 10 MW and above, and IEGC-2010 scheduling for wind plants of 10 MW and above at 33 kV and above; metering, billing and a 60-day payment settlement with late-payment surcharge and prompt-payment rebates; third-party sale rights on payment default; start-up and shutdown power drawal; banking (including deemed banking before COD and deemed purchase of unutilised banked energy by Discoms); STU/Distribution Utility bearing full evacuation-infrastructure cost; Jharkhand Industrial Policy 2012 incentives and the treatment of subsidies and accelerated depreciation in tariff; pass-through of taxes and duties; and single-window clearance (p17–21).

Parts A6–A8 give the Commission power to remove difficulties, power to amend, and savings preserving its inherent and residual powers (p21). The Appendix supplies the assumption and tariff-computation forms a developer must file with a project-specific tariff petition (p23–26).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of JSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.