GERC · Gujarat Electricity Regulatory Commission
DRES Regulations, 2026 — Statement of Reasons
Statement of Reasons on Gujarat Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026.
Statement of reasonsDated 30 Oct 2026
The commission's reasons for the Grid Interactive Distributed Renewable Energy Sources Regulations, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Commission's Statement of Reasons explains why the Gujarat Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026 were finalised. It opens with the coram, the statutory basis under the Electricity Act, 2003 and the consultation chronology: draft published 15.05.2026, newspaper notices on 16 and 17.05.2026, comments invited up to 18.06.2026, and a public hearing on 18.06.2026 (p1–2). It records that all comments were considered and that Annexures I and II list written commentators and hearing participants (p2, p240–241).
The bulk of the document is a regulation-by-regulation review of the draft. For each provision it summarises stakeholder objections, gives the Commission's analysis and, where accepted, reproduces revised text (p3–239). Early sections deal with definitions and scope: the DRES definition and its voltage linkage to the Supply Code, whether STU-connected consumers can use the framework, the scope of group net metering, prosumer/BESS treatment, financial-year wording and the refusal to create a separate behind-the-meter category (p3–23).
The central block covers general conditions, application procedure, technical feasibility, system strengthening and eligibility/capacity for net metering, net billing, gross metering, group net metering and virtual net metering (p23–148). It settles which consumers and DRES owners qualify, the capacity bands and voltage alignment, BESS obligations where DRES exceeds contract demand, the non-retrospective treatment of existing projects, the single-arrangement rule and limited switching, the application and connectivity-fee process, deemed acceptance for small installations, and the direction to GUVNL and distribution licensees to prepare procedures, portals and agreements (p23–148).
Energy accounting and commercial settlement are dealt with in detail for each metering arrangement, including meter reading and bill disclosures, 15-minute block banking, the adjustment cap for non-residential consumers, full adjustment and no banking charges for residential consumers, lapsed energy, time-of-day treatment and year-end credit settlement (p148–192). Open access charges are then addressed: banking charges, cross-subsidy and additional surcharge, captive-status criteria, and the residential RESCO exemption (p193–206).
The remaining sections cover interconnection and metering, the restriction on simultaneous arrangements, wind turbine and hybrid DRES, FIFO settlement, communication/RTU and remote monitoring, the enabling peer-to-peer provision, and retention of carbon-credit proceeds by the prosumer/owner (p206–232). The SoR closes with drafting corrections, other comments, a direction to publish the Regulations in the Official Gazette after incorporating the changes, and the signatures dated 30/10/2026 (p232–239).
Read with this
The regulation
One more document belongs here and is not on Voltaic: a procedure or order made under it.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.