Grid Interactive Distributed Renewable Energy Sources Regulations, 2026

Gujarat Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026

RegulationDated 30 Oct 2026Published in the Gazette 30 Oct 2026GERC/2026/11/Tech/2270

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Gujarat Electricity Regulatory Commission issued these regulations in the Gujarat Government Gazette of 30 October 2026 under the Electricity Act, 2003, replacing its 2016 rooftop-solar net-metering framework with a single regime for grid-interactive distributed renewable energy systems (DRES). They extend to the whole State and take effect from Gazette notification (p1).

Regulation 2 defines DRES, prosumers, participating consumers, RESCOs, BESS and the five delivery routes: net metering, net billing, gross metering, group net metering and virtual net metering (p2–4). Chapters 3–4 make all consumer categories eligible subject to route-specific capacity bands, bar consumers with undisputed arrears, require interconnection to CEA/GERC standards and distribution-licensee procedures, and address wheeling, open-access charges, RESCO commercial arrangements and BESS where DRES capacity exceeds contract demand above a threshold (p4–6).

Chapters 5–7 set the application route: connectivity fee through Annexure I, technical feasibility, deemed acceptance for small installations, system-strengthening charges, obligations on the distribution licensee to prepare procedures, a web portal and software-based energy accounting within stated deadlines, and a time-bound table covering GEDA registration, CEI approval, technical feasibility, agreement, system strengthening, commissioning and metering. The licensee must compensate for unjustified delay, and PM Surya Ghar installations have a deemed connectivity agreement (p6–11; p28).

Chapter 8 consolidates eligibility at consumer/prosumer and DRES-owner level, the capacity ranges and special conditions for each metering arrangement, switching and participating-consumer substitution rules, the lead/nodal consumer concept and a summary table (p11–14). Chapter 9 is the settlement code: it specifies billing information, how exports are adjusted, treatment of banked and lapsed energy, time-of-day treatment, deemed purchase of residential surplus, and the separate accounting mechanisms for net metering, net billing, gross metering, group net metering and virtual net metering (p14–20).

Chapter 10 specifies open-access charges, banking charges, cross-subsidy and additional-surcharge treatment, captive eligibility, concessions where RE attributes are left to the licensee for RPO, and residential exemptions (p20–22). Chapters 11–16 set technical interconnection and safety conditions, ownership boundaries, disconnection rights, anti-islanding, protection, metering and communication requirements, meter-defect treatment and RPO treatment; they also prohibit simultaneous metering arrangements, make VNM and Green Energy Open Access mutually exclusive, regulate capacity additions and hybrid DRES, and provide for FIFO settlement (p22–26). Chapters 17–24 enable future peer-to-peer transactions by separate instrument, give the Commission dispute jurisdiction outside CGRF, let prosumers retain all carbon-credit proceeds, and confer powers to issue directions, relax, amend and remove difficulties (p27).

Annexures I to V operationalize the regime: a connectivity-fee schedule; model application forms for NM/NB/GM, GNM and VNM; a model interconnection agreement for NM/NB/GNM/GM; and model VNM agreements for captive and RESCO/third-party ownership, each with appendices and document checklists (p28–68).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Net billing, Gross metering

Read with this

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a procedure or order made under it.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.