KERC · Karnataka Electricity Regulatory Commission
Generation Tariff Regulations, 2009 — Chapter 1 Preliminary
Karnataka Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2009
RegulationDated 9 Sep 2009Published in the Gazette 8 Oct 2009No.S/03/O dated 9th September 2009
Replaced by Generation Tariff Regulations, 2014
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the opening chapter of the Karnataka Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2009. Pages 1–2 set out the statutory and policy backdrop: the Commission acts under Sections 61 and 62 of the Electricity Act, 2003 and is guided by CERC tariff principles, commercial operation, competition, consumer interest, multi-year tariff principles, cross-subsidy reduction, promotion of co-generation and renewables, and the National Electricity Policy. The preamble records the CERC tariff notification of 18 January 2009, KERC's draft regulations published on 1 August 2008 and the public hearing held on 18 February 2009. The regulations are made under Sections 61, 62 and 86 and Section 181(2)(zd)–(zf) read with the CERC (Terms and Conditions of Tariff) Regulations, 2009 (p2).
Regulation 1 gives the title, extends the regulations to the whole of Karnataka, and brings them into force on publication in the Karnataka Gazette, which the notification says occurred on 8 October 2009; they remain in force up to 31 March 2014 unless reviewed earlier or extended (p1–3).
Regulation 2 sets the scope: it applies to generation tariff cases filed after 1 April 2009 for supply to a distribution licensee, state-owned stations whose capacity is allocated by the State Government, new units or stations with commercial operation on or after 1 April 2009, and specified existing stations whose PPAs are still awaiting approval, with transitional tariff arrangements. It excludes non-conventional and captive generation selling to distribution licensees, existing stations with already-approved PPAs, and supply under concluded contracts, while requiring ESCOM ERC arrangements to be converted into PPAs under these regulations within three months (p3–4).
Regulation 3 (pp4–11) is a definitions chapter covering around 46 terms, including commercial operation, declared capacity, design energy, cut-off date, change in law, plant availability factor, useful life, run-of-river and storage hydro types, and a frequency-linked rule for deemed scheduled generation for gas stations. The substantive tariff-determination chapters and the clauses 26–27 referred to for availability factors are not included.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.