KERC · Karnataka Electricity Regulatory Commission
Generation Tariff Regulations, 2014
Karnataka Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2014
RegulationDated 26 Aug 2015In force from 1 Apr 2014No: KERC/F-34/Vol-12/15-16/ dated 26.08.2015
Replaced by Generation Tariff Regulations, 2019
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 34 of 71. Check the regulator's original before you rely on it.
Although labelled Appendix-I, it contains the operative principal regulations. They apply to generating stations and units whose tariff the Commission determines under sections 62 and 86 of the Electricity Act, 2003, for stations achieving commercial operation from 1 April 2014 to 31 March 2019; they also cover existing stations whose tariff was not finally determined, using the 2009 regulations for the period ending 31.03.2014. Renewable-energy stations covered by the 2004 renewable procurement regulations and projects awarded through section 63 competitive bidding are excluded (p1–2).
Chapter 1 (p2–13) defines the regulatory vocabulary: commercial operation, capital cost, cut-off date, change in law, force majeure, prudence check, useful life, and related terms. Chapter 2 (p14–31) sets the tariff-determination procedure and cost framework: application and publication requirements, prudence check of capital cost for new and existing projects, IDC/IEDC, initial spares, additional capitalization and de-capitalization, renovation and modernisation, infirm-power revenue, special and compensation allowances, and debt-equity treatment. It also establishes true-up, controllable/uncontrollable parameter sharing, and the treatment of delays and cost over-runs.
Chapter 3 (p32–34) begins the tariff structure: capacity and energy charges, the components of annual fixed cost and landed fuel cost, and return on equity, including station-type base returns, incentives/penalties for timely completion and grid-code compliance, and tax gross-up.
Read with this
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 26 Aug 2015Generation Tariff Regulations, 2014 — Order
One more document belongs here and is not on Voltaic: a commencement notice or statement of reasons not held as English text.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.