Generation Tariff Regulations, 2014

Karnataka Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2014

RegulationDated 26 Aug 2015In force from 1 Apr 2014No: KERC/F-34/Vol-12/15-16/ dated 26.08.2015

Replaced by Generation Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software, from pages 1 to 34 of 71. Check the regulator's original before you rely on it.

Although labelled Appendix-I, it contains the operative principal regulations. They apply to generating stations and units whose tariff the Commission determines under sections 62 and 86 of the Electricity Act, 2003, for stations achieving commercial operation from 1 April 2014 to 31 March 2019; they also cover existing stations whose tariff was not finally determined, using the 2009 regulations for the period ending 31.03.2014. Renewable-energy stations covered by the 2004 renewable procurement regulations and projects awarded through section 63 competitive bidding are excluded (p1–2).

Chapter 1 (p2–13) defines the regulatory vocabulary: commercial operation, capital cost, cut-off date, change in law, force majeure, prudence check, useful life, and related terms. Chapter 2 (p14–31) sets the tariff-determination procedure and cost framework: application and publication requirements, prudence check of capital cost for new and existing projects, IDC/IEDC, initial spares, additional capitalization and de-capitalization, renovation and modernisation, infirm-power revenue, special and compensation allowances, and debt-equity treatment. It also establishes true-up, controllable/uncontrollable parameter sharing, and the treatment of delays and cost over-runs.

Chapter 3 (p32–34) begins the tariff structure: capacity and energy charges, the components of annual fixed cost and landed fuel cost, and return on equity, including station-type base returns, incentives/penalties for timely completion and grid-code compliance, and tax gross-up.

Standard name
Generation Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Capital cost and investment

Read with this

Other copies of these documents (1)

One more document belongs here and is not on Voltaic: a commencement notice or statement of reasons not held as English text.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document