MERC · Maharashtra Electricity Regulatory Commission
Voltage-wise Allocation of Assets and Cost Guidelines — Statement of Reasons, 2022
MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (GUIDELINES FOR ALLOCATION OF ASSETS AND COST AT DIFFERENT VOLTAGE LEVELS OF DISTRIBUTION) STATEMENT OF REASONS
Statement of reasonsDated 21 Jul 2022
The commission's reasons for the Allocation of Assets and Cost at Different Voltage Levels of Distribution — Guidelines, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Commission's Statement of Reasons (SoR) recording how MERC finalised the Guidelines for Allocation of Assets and Cost at Different Voltage Levels of Distribution, dated 21 July 2022 (p1). It explains that Distribution Licensees run two businesses — Wires and Supply — and that Wires costs have so far been split across voltages using a ratio of assets; a petition by Tata Power led to a study of domestic and international practice and to draft Guidelines with an Explanatory Memorandum published on 18 April 2022, open for comment to 13 May 2022 (p2–3). Section 1 sets out the aim: allocate assets, and each element of Wires cost, to EHT, HT and LT on principles of cost causation — usage and need rather than voltage rating alone — to reduce indirect cross-subsidy between voltage users and to standardise practice across licensees, including where competing licensees operate in the same area (p3).
Section 2 takes each issue in turn, quoting the draft clause, summarising stakeholder comments and giving the Commission's decision (p5–18). It deals with the composition of purpose-based asset bundles under Clause 2.3, with a revised inclusions list and treatment of BEST's legacy 110/33kV and 110/11kV substations (p5–8); allocation of past revenue gap/surplus through a new Clause 5.12 (p8–9); the split of Common to Business assets between Wires and Supply, with a corrected numerical illustration of the EM's Table 19 (p9–10); the 50:50 customer-driven / network-driven allocation of Wires common assets and O&M cost and a new Clause 4.4 on which consumers and line lengths to count (p10–12); replaced Clauses 5.5 and 5.6 on depreciation of Common to Network and Common to Business asset blocks (p13–14); Clause 5.7 on interest and return on equity (p14–15); a new Clause 5.13 allowing licensees to propose methodology for costs not covered (p15–16); and Clause 6.3, confirming the Guidelines govern determination of wheeling charges from 01.04.2025, with a mock exercise in the interim MTR petitions (p16–17). The closing paragraphs dispose of consumer and MSEDCL comments on voltage granularity, EHT consumer contributions and the scope of the exercise (p17–18). Annexure-I lists the 21 stakeholders who commented (p19).
Read with this
The regulation
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.