MERC · Maharashtra Electricity Regulatory Commission
Allocation of Assets and Cost at Different Voltage Levels of Distribution — Guidelines, 2022
GUIDELINES FOR ALLOCATION OF ASSETS AND COST AT DIFFERENT VOLTAGE LEVELS OF DISTRIBUTION
GuidelinesDated 21 Jul 2022In force from 1 Apr 2025
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Maharashtra Electricity Regulatory Commission issued these Guidelines on 21 July 2022 to standardise how distribution licensees in the State split their assets and costs between the Wires (wheeling) business and the Retail Supply business, and then across EHT, HT and LT voltage levels (p1–2). They respond to Case No. 133 of 2020 filed by Tata Power Company and to the Commission's order of 9 December 2020 directing a study and public consultation on uniform allocation principles (p1–2).
The document first sets out the legal duties under sections 61, 62, 42 and 9 of the Electricity Act 2003, then states its objectives: a uniform methodology, fair and comparable wheeling charges, and cost recovery corresponding to each consumer's voltage of connection (p2). It lists six issues it addresses, from asset segregation to implementability (p2).
The methodology runs through six numbered sections. Section 1 requires licensees to form three asset groups — Wires, Supply and Common to Business — with indicative lists of Supply-dedicated and Common assets and directions for classifying new or unlisted assets (p3–4). Section 2 requires Wires assets to be bundled by purpose before voltage allocation, with an indicative bundle table and a clarification that this is for allocation only and does not change statutory accounts (p4–6).
Section 3 allocates the three Wires asset groups over voltage levels: voltage-identifiable lines and meters by their rating; boundary assets such as distribution and consumer substations by secondary-side voltage; and common-to-voltage assets pro rata to identifiable plus boundary assets (p6–7). Section 4 first splits Common to Business assets between Wires and Supply using the dedicated-asset ratio, then allocates the Wires share 50% on consumer numbers and 50% on circuit-km of line (p7–8).
Section 5 turns the resulting asset ratios into cost allocation rules for each Distribution Wires ARR element — depreciation, interest on long-term loans, return on equity, contingency reserve, O&M, working capital, bad debts, income tax and past revenue gaps — specifying which are computed directly and which ride on ratios (p8–10). Section 6 sets implementation directions, including updating asset records and moving to ERP/SAP, and states that the Guidelines come into force from 01.04.2025 (the fifth MYT Control Period) while licensees must also present results using these principles alongside existing wheeling charge computations in their upcoming MTR petitions (p11).
Read with this
Commencement notices and reasons
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.