The Bihar Electricity Regulatory Commission's *Fixation of Charges for Supply of Electricity by Distribution Licensee* Regulations, 2018 (Notification No. BERC-SMP-4/2018, notification dated 13 July 2018, gazetted 17 July 2018) are a framework regulation, not a tariff order. Made under s.181(2)(u) read with s.45 of the Electricity Act 2003, they apply to all distribution licensees in Bihar, including deemed licensees, and to all consumers in the State, and commence on gazette publication (p1).
Regulations 1–2 fix the title, extent and commencement and define the vocabulary the rest of the instrument depends on — authorised load, connected load, contract demand, consumer (with low-, high- and extra-high-tension sub-classes) and distribution licensee (p1–2).
Regulation 3 sets the pricing philosophy: charges for each consumer category should reflect the prudent and efficient cost of supply, AT&C losses are to be factored in, category charges are to stay within a bounded band of cost of supply, and cross-subsidy is to fall progressively to category-wise cost of supply by the end of the next control period (FY 2021-22), with licensees filing a roadmap (p2).
Regulation 4 leaves consumer categorisation and terms of supply to the Commission's tariff orders, with categories based on the purpose of supply and possible sub-categorisation by voltage, location or consumption (p3).
Regulation 5 enumerates the heads under which a licensee may recover: fixed or demand charges, energy charges, meter/plant rentals, miscellaneous charges (application, inspection, meter testing, removal/re-fixing, reconnection/disconnection, supervision and connection charges), surcharge and rebate, and penal charges for excess demand (p3–4).
Regulation 6 gives the cost build-up methodology for each head and requires licensee proposals to be approved by the Commission — no charge may be recovered without specific approval (p4–5). Regulations 7–9 cover removal of difficulties, savings preserving the Commission's inherent powers and ability to vary procedure, and periodic review with re-notification every three years (p5–6).
Read with this
Earlier drafts
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.