Fixation of Charges for Supply of Electricity by Distribution Licensee Regulations, 2018

RegulationDated 13 Jul 2018Published in the Gazette 17 Jul 2018BERC-SMP-4/2018 dated The 13th July, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Bihar Electricity Regulatory Commission's *Fixation of Charges for Supply of Electricity by Distribution Licensee* Regulations, 2018 (Notification No. BERC-SMP-4/2018, notification dated 13 July 2018, gazetted 17 July 2018) are a framework regulation, not a tariff order. Made under s.181(2)(u) read with s.45 of the Electricity Act 2003, they apply to all distribution licensees in Bihar, including deemed licensees, and to all consumers in the State, and commence on gazette publication (p1).

Regulations 1–2 fix the title, extent and commencement and define the vocabulary the rest of the instrument depends on — authorised load, connected load, contract demand, consumer (with low-, high- and extra-high-tension sub-classes) and distribution licensee (p1–2).

Regulation 3 sets the pricing philosophy: charges for each consumer category should reflect the prudent and efficient cost of supply, AT&C losses are to be factored in, category charges are to stay within a bounded band of cost of supply, and cross-subsidy is to fall progressively to category-wise cost of supply by the end of the next control period (FY 2021-22), with licensees filing a roadmap (p2).

Regulation 4 leaves consumer categorisation and terms of supply to the Commission's tariff orders, with categories based on the purpose of supply and possible sub-categorisation by voltage, location or consumption (p3).

Regulation 5 enumerates the heads under which a licensee may recover: fixed or demand charges, energy charges, meter/plant rentals, miscellaneous charges (application, inspection, meter testing, removal/re-fixing, reconnection/disconnection, supervision and connection charges), surcharge and rebate, and penal charges for excess demand (p3–4).

Regulation 6 gives the cost build-up methodology for each head and requires licensee proposals to be approved by the Commission — no charge may be recovered without specific approval (p4–5). Regulations 7–9 cover removal of difficulties, savings preserving the Commission's inherent powers and ability to vary procedure, and periodic review with re-notification every three years (p5–6).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Cost of supply and cost allocation, Subsidy and cross-subsidy

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.