Fixation of Charges for Supply of Electricity by Distribution Licensee Regulations 2018 — Draft
Bihar Electricity Regulatory Commission (Fixation of Charges for Supply of Electricity by Distribution Licensee) Regulations 2018
Draft regulationDated 29 Jan 2018SMP No. 4/2018 dated ..29/01/2018
Draft
A proposal that has since been finalised as the Fixation of Charges for Supply of Electricity by Distribution Licensee Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This BERC consultation package proposes a new regulation on how the charges a distribution licensee recovers for supplying electricity are fixed. Pages 1–3 are the public notice and consultative paper; pages 4–10 carry the draft regulations themselves.
The notice (p1) records the Commission's suo-motu proceeding, SMP No. 4/2018, to make the 2018 Fixation of Charges Regulations. The draft and consultative paper are available from the Commission's office and its website free of cost; comments and objections must reach the Secretary by 09.03.2018, and a public hearing will be held at the Commission's office at 11.00 A.M. on 20.03.2018 (p1, p3).
The consultative paper (pp2–3) grounds the exercise in s.181(2)(u) and s.45(2) of the Electricity Act, 2003, notes that retail tariffs are already determined under the Act, the Tariff Policy and BERC's Multi Year Distribution Tariff Regulations, 2015, and proposes regulations specifying the methods and principles by which s.45(2) charges are fixed and publicised.
The draft has nine regulations. Regulation 1 sets the title, applies the regulations to all distribution licensees including deemed licensees and to all consumers in Bihar, and brings them into force on publication in the Official Gazette. Regulation 2 defines the load, consumer and licensee terms used throughout (pp4–5). Regulation 3 sets general principles: charges should reflect prudent and efficient cost of supply, AT&C losses are to be counted, and cross-subsidy must move progressively into a band around cost of supply, with the licensee filing a reduction roadmap (pp5–6). Regulation 4 leaves consumer categorization and terms of supply to tariff orders. Regulation 5 lists the charge heads, and Regulation 6 gives the cost base and allocation basis for each while requiring Commission approval before any charge is recovered (pp6–9). Regulations 7–9 cover removal of difficulties, savings and three-yearly review (pp9–10).
Read with this
The regulation
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.