KERC · Karnataka Electricity Regulatory Commission
Rooftop Aero Turbine with Solar or Without Solar Regulations, 2024 — Draft
KERC (Implementation of rooftop aero turbine with solar or without solar) Regulations, 2024
Draft regulationDated 9 Oct 2024Published in the Gazette 10 Oct 2024KERC/S/03/1/769 dated 09.10.2024
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Karnataka Electricity Regulatory Commission draft regulation package for grid-connected rooftop aero turbine (RAT) plants, with or without solar. Pages 1-2 are the Commission's publication notice: it cites the Electricity Act 2003 renewable and tariff provisions, explains that RATs are small rooftop wind plants suited to urban and suburban wind conditions, links the proposal to the Karnataka RE Policy 2022-27, and invites objections or suggestions within 30 days from gazette publication. The draft is to be finalised after that period (p1-2).
Pages 3-16 contain the draft regulation text. Regulations 1-2 set the short title, commencement from the date of Official Gazette publication, and definitions, including eligible consumer, RAT plant, SRTPV plant, gross metering, net metering and interconnection point (p3-4). Regulation 3 requires distribution licensees to offer gross or net metering on a non-discriminatory, first-come-first-served basis, subject to capacity limits and grid-code compliance (p4-5). Regulation 4 sets eligibility capacity rules: a RAT-with-solar installation must be at least 1 kW, one resource may be up to the sanctioned load and the other up to 25% of it, with total capacity not exceeding 1.25 times the sanctioned load; RAT without solar must be at least 1 kW and not exceed the sanctioned load (p5). Regulation 5 lays out the application, approval, PPA, commissioning and reporting procedure, including the 180-day commissioning window and consequences of delay (p6). Regulation 6 specifies interconnection voltage by capacity band, technical standards, safety, anti-islanding and disconnection rights (p6-10). Regulations 7-8 provide for generic tariff determination, control-period treatment, and tariff parameters such as CUF, capital cost, debt-equity, depreciation, return on equity, working capital and O&M (p10-13). Regulations 9-11 cover metering, energy accounting and settlement, and the PPA framework, including deemed approval for PPAs up to 1000 kW and Commission approval above that threshold (p13-16). Regulations 12-13 provide grievance redressal and powers to remove difficulties (p16).
Read with this
The regulation
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.