DERC · Delhi Electricity Regulatory Commission
Compensation to Victims of Electrical Accidents Regulations, 2024 — Statement of Reasons
Statement of Reasons for DERC (Compensation to Victims of Electrical Accidents) Regulations
Statement of reasonsDated 27 Jun 2024
The commission's reasons for the Compensation to Victims of Electrical Accidents Regulations, 2024.
Summary
Summary written by software, from pages 1 to 22 of 34. Check the regulator's original before you rely on it.
The document is DERC’s Statement of Reasons for the Delhi Electricity Regulatory Commission (Compensation to Victims of Electrical Accidents) Regulations, 2024. The background (p1) explains that the 2017 Supply Code and Performance Standards Regulations do not cover compensation for electrical accidents, that DERC acted on a Government of NCT of Delhi direction under s.108 of the Electricity Act, 2003, published a draft in 2021 for comment, and finalised the 2024 Regulations. The bulk of the supplied text records stakeholder comments and the Commission’s responses, regulation by regulation, often reproducing draft and replacement clauses (pp2–22).
On legal basis and citation, stakeholders sought alignment with s.57 and s.176(2)(w); the Commission accepts the correction to “s.181(2)(za)” but rejects other changes (pp2–3). The short-title clause says the Regulations extend to the whole State of Delhi and apply to all generating companies and transmission and distribution licensees in their licensed areas; they commence from Gazette publication. BYPL/BRPL object to notification, but the Commission proceeds with the 2024 Regulations (p3).
In definitions, the Commission adds “Electrical Accident”, retains “Dependents” without requiring a succession certificate, and deletes IPC-based “Hurt” and “Grievous hurt” definitions; it also confirms CEA Safety Regulations references (pp4–6). Regulation 4 safety standards are retained, requiring gencos and licensees to protect the public, persons, animals and birds and to comply with CEA safety regulations; TPDDL’s deletion request and BRPL/BYPL concerns about wildlife, false claims and infeasible safety parameters do not change the text (pp6–7).
Regulation 5 makes gencos and licensees liable to pay compensation for failure to meet performance standards. The Commission rejects a fresh hearing before payment, citing stakeholder consultation and the Electrical Inspector’s inquiry, and rejects ARR pass-through of compensation; TPDDL’s proposed exclusion list is not added (pp8–13). Regulation 6 quantum is revised: death compensation is raised from Rs. 5,00,000 to Rs. 7,50,000 per person, hospitalization amounts are retained, and animal/poultry compensation is replaced by final Section 10 with revised rates and ceilings; an insurance-offset suggestion is rejected (pp13–18).
Other rights, insurance rights and the special-order revision mechanism are retained (pp18–20). Regulation 10 requires a 24-hour accident report to the Electrical Inspector and concerned authority in Annexure-I/Form-A; the Commission adds an explanation defining “concerned authority” as an officer at General Manager level or above, and reproduces this as final Regulation 13 (pp20–22).
Read with this
The regulation
- Dated 27 Jun 2024Compensation to Victims of Electrical Accidents Regulations, 2024
Other copies of these documents (1)
- Dated 25 Jul 2024Compensation to Victims of Electrical Accidents Regulations, 2024
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.