Compensation to Victims of Electrical Accidents Regulations, 2024
Delhi Electricity Regulatory Commission (Compensation to Victims of Electrical Accidents) Regulations, 2024
RegulationDated 27 Jun 2024No.F.17 (293)/Engg/DERC/ 2021-22
Summary
Summary written by software. Check the regulator's original before you rely on it.
These DERC Regulations create a self-contained compensation regime for electrical accidents in Delhi. They are made under section 57 read with section 181(2)(za) of the Electricity Act, 2003, extend to the whole of NCT of Delhi, and bind all generating companies and transmission and distribution licensees in their licensed areas (p1). They take effect from the date of gazette publication, which is not printed; the only printed date element is the year 2024 in the title (p1).
Chapter I (pp1–2) is preliminary — short title, extent, application and commencement, plus definitions of Authority, Commission, Compensation, Concerned Authority, Dependents, Electricity system, Electrical Accident, Injury, Licensee, Poultry, Person with disability (a 40% disability threshold) and Victim — and an interpretation clause that imports meanings from the Act, the DERC Supply Code and Performance Standards Regulations, 2017 and the CEA Safety Regulations, 2023.
Chapter II (pp2–3) sets safety standards of performance: mandatory compliance with the CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 as amended, and a duty so to install, maintain and operate works as to protect the public, animals and birds. Chapter IV? No — Chapter III (pp3–4) fixes the compensation payable for loss of human life, for disability above and below a 60% band with a 40% floor, and reimbursement of hospitalisation charges against certified bills; it preserves other legal, contractual and insurance remedies and lets the Commission enhance limits by special order. Chapter IV (pp4–5) does the same for milch and draught animals and poultry, with per-household ceilings and certification by a State-designated competent authority.
Chapter V (pp5–7) is the procedure: report the accident on Form A to the Electrical Inspector and the Concerned Authority within 24 hours; designate a Concerned Authority (not below General Manager) within 30 days and publish it; Electrical Inspector's enquiry report within 30 days; the Concerned Authority's final order within a further 30 days; a claimant may file Annexure II within 90 days; the order is communicated within 7 days and paid within 15 days, with a penal rate for delay. Disputes go to the CGRF and then the Ombudsman under the 2018 grievance regulations; licensees report accidents to the Commission monthly; non-compliance is deemed contravention under sections 142 and 146. Chapter VI (p8) is residuary — inherent powers, power to amend, remove difficulties and dispense with clauses. Annexures (pp9–13) are the reporting, Form A and claim formats.
Read with this
Commencement notices and reasons
Other copies of these documents (1)
- Dated 25 Jul 2024Compensation to Victims of Electrical Accidents Regulations, 2024
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of DERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.