Madhya Pradesh Electricity Regulatory Commission (Ancillary Services) Regulations, 2024 (G-48 of 2024).
RegulationDated 30 Sep 2024MPERC/D(T)/2024/2180 dated 30.09.2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the MPERC's principal regulation creating a State-level ancillary services framework, notified on 30 September 2024 as G-48 of 2024 (p1). It is deliberately split in two: the Regulations themselves set the architecture and the binding obligations, while almost every operational number, formula and format is pushed to a "Detailed Procedure" that the Nodal Agency — the State Load Despatch Centre — must submit to the Commission for approval within three months, after a newspaper-and-website public consultation (p13).
The opening Regulations 1–6 set the short title, a commencement clause that leaves the effective date to a future Commission notification, the objective (minimising State deviation, keeping frequency near 50 Hz, relieving intra-State congestion), thirty defined terms, scope over intra-State entities including storage and demand-response resources, the four categories of ancillary service, and the Nodal Agency's duty to estimate and refresh the SRAS requirement (p1–5). Part I (Regulations 7–13) is the operative core for Secondary Reserve Ancillary Service: eligibility of providers, the events and formula triggering activation, procurement through standing consent and monthly price declarations, despatch by four-second control signal, payment and payback through the State DSM Pool Account, performance monitoring, and disqualification for persistent under-performance (p5–11).
Part II (Regulation 14) deals with shortfall in SRAS procurement or emergencies, deeming Section 62 generating stations including those holding un-requisitioned surplus available to the Nodal Agency (p11). Part III (Regulations 15–16) covers weekly accounting and settlement on interface meter data, the deviation formula for providers, charging and crediting of the State DSM Pool Account, and a blanket exemption from transmission charges, losses and transmission deviation charges for SRAS (p11–12). The Miscellaneous Regulations 17–19 give the contents of the Detailed Procedure, and confer power to relax and power to remove difficulty on the Commission (p13–14).
Read with this
Other copies of these documents (1)
- Dated 30 Sep 2024Ancillary Services Regulations, 2024
2 more documents belong here and are not on Voltaic: 1 commencement notice or statement of reasons not held as English text and 1 copy in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.