Ancillary Services Regulations, 2024

Madhya Pradesh Electricity Regulatory Commission (Ancillary Services) Regulations, 2024 (G-48 of 2024)

Regulation · Gazette copyDated 30 Sep 2024No. MPERC/D(T)/2024/2180 dated 30th September 2024

The Gazette copy of the Ancillary Services Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The MPERC (Ancillary Services) Regulations, 2024 (G-48 of 2024) build the framework for procuring, deploying and paying for ancillary services inside Madhya Pradesh. The Commission makes them under s.181 read with s.86(1)(h) and (i) of the Electricity Act 2003, signed by Secretary Umakanta Panda and dated 30 September 2024 (p1). They do not start automatically: clause 1.2 defers commencement to a date the Commission notifies, and no Gazette date is printed in the text (p1).

The stated objective (p1) is to minimise the State's deviation, help the SLDC hold frequency near 50 Hz and relieve congestion in the intra-State transmission network. Regulation 3 defines the vocabulary of the scheme (pp1–4); Regulation 4 extends the Regulations to intra-State entities including energy storage resources and demand-response providers (p5); Regulation 5 lists four classes of service — PRAS, SRAS, TRAS and anything the MP Grid Code adds — while giving a working mechanism only for SRAS (p5).

Part I (Regulations 7–13, pp5–11) is the operative core: who may be an SRAS provider and on what technical conditions (pp5–6); how the SLDC as Nodal Agency estimates, re-estimates and publishes the reserve requirement (p5); how SRAS is triggered through Area Control Error, with a stated formula, frequency bias and offset, under either tie-line-bias or flat tie-line control (pp6–7); how providers give standing consent, declare technical parameters and declare energy or compensation charges subject to a market-price ceiling (pp7–8); how the Nodal Agency selects on merit order and despatches automatic secondary control signals (p9); how providers are paid, or pay back, out of the State DSM Pool Account on 15-minute blocks (pp9–10); and how performance is measured and penalised (pp10–11).

Part II (p11) deems Section 62 generating stations, including those holding un-requisitioned surplus, available to the Nodal Agency when SRAS is short or the grid is in emergency. Part III (pp11–12) prescribes weekly accounting, deviation settlement alongside the DSM Regulations, pool-account debits and credits, and exemption from transmission charges, losses and transmission deviation charges. Part IV (pp13–14) requires the Nodal Agency to submit a Detailed Procedure through public consultation and gives the Commission power to relax provisions and remove difficulties.

Standard name
Ancillary Services Regulations
Primary topics
Ancillary services and reserves, Scheduling and despatch, Energy accounting and settlement

Read with this

The regulation

2 more documents belong here and are not on Voltaic: 1 commencement notice or statement of reasons not held as English text and 1 copy in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document