Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a September 2015 consultant discussion paper prepared by ABPS Infrastructure Advisory Private Limited for the Maharashtra Electricity Regulatory Commission. It sets out the reasoning and proposed draft clauses for the MERC Multi Year Tariff Regulations, 2015, intended for the third Control Period from 1 April 2016 to 31 March 2020 (p1, p20). It is a consultation document, not a notified regulation: it reproduces or summarises the existing MERC MYT Regulations, 2011, compares CERC and other State practice, and proposes replacement clauses for stakeholder comment (pp9–11).
Sections 1–2 explain the MYT objectives and propose to continue modified cost-plus regulation with prudence checks, a four-year control period, discontinuation of the separate Business Plan and Annual Performance Review, and a mid-term review after two years (pp9–26). They also propose petition timelines, including a Multi Year Tariff Petition by 30 November 2015 and a Mid-term Review Petition by 30 November 2017 (pp17, 21–25), and set out the treatment of controllable and uncontrollable factors, sharing of gains and losses, monthly fuel adjustment under ZFAC and yearly pass-through under ZOUC (pp27–44).
Section 3 covers broad financial principles: accounting and allocation statements, financial prudence, capital cost and additional capitalisation, debt-equity, return, depreciation, consumer contributions and grants, interest on loans, foreign exchange variation, working capital, carrying cost, income tax, rebates and delayed payment, contingency reserves and prior-period items (pp45–92). It proposes mandatory separate accounting statements for each regulated/licensed business from FY2016-17 and rejection of petitions for non-compliance (pp49–51).
Section 4 deals with generation tariff: common issues such as provisional tariff, renovation and modernisation, non-tariff income and billing; thermal tariff components and operating norms; O&M norms; annual fixed charges and energy charges; fuel surcharge adjustment; and hydel and pumped-storage tariff, O&M and lease rent (pp93–142). Section 5 covers transmission: applicability, tariff components, non-tariff income, provisional tariff, continuation of pooled postage-stamp transmission pricing and sharing by Base Transmission Capacity Rights, capital investment, availability norms and incentives, O&M norms by bay and circuit-km, and transmission losses (pp143–169). It also proposes removing reactive energy charges (p145).
Section 6 covers the distribution wires business: ARR, separation of wires and retail supply accounts, a default allocation matrix, non-tariff income, wheeling charge recovery, distribution loss trajectory to be set in the MYT order, O&M norms, capital expenditure, bad-debt provisioning and wheeling charge determination (pp170–187). Section 7 covers retail supply: ARR, distribution loss and collection efficiency, power procurement planning and PPA approval, O&M norms, bad debts, capital investment, non-tariff income, cross-subsidy and additional surcharge receipts, and retail tariff determination based on average cost of supply and gradual cross-subsidy reduction (pp188–203). Section 8 covers MSLDC fees and charges: capital investment, LDC Development Fund, annual fixed charges, O&M, RLDC and WRPC charges, non-tariff income, sharing of MSLDC charges, other fees, and billing and payment (pp204–211).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 9 Sep 2015Public notice: Public Notice Inviting Comments on Draft Multi Year Tariff Regulations, 2015
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.