MERC · Maharashtra Electricity Regulatory Commission
Public Notice Inviting Comments on Draft Multi Year Tariff Regulations, 2015
Inviting Comments on Draft MERC (Multi Year Tariff) Regulations, 2015
Public notice on a draftDated 9 Sep 2015Advertisement No.08/ 2015-16 dated 9th September, 2015
Draft
Voltaic holds no final regulation made from this draft.
Public notice on the Multi Year Tariff Regulations, 2015 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page public consultation notice, not a regulation. MERC states that it has prepared the draft MERC (Multi Year Tariff) Regulations, 2015, which would supersede the MERC (MYT) Regulations, 2011 (p1).
The notice announces that the draft Regulations, together with a Discussion Paper, are available in downloadable format on the Commission's two websites (p1). It invites written comments, suggestions and objections on the draft, to be sent to the Secretary, MERC, at the Commission's Mumbai address, in 6 (1+5) copies either in person or by post, or by fax or e-mail to the numbers and address given (p1).
The operative date is the deadline: anything received on or before 30 September 2015 will be considered before the draft is finalised (p1). The notice is dated 9 September 2015 and signed by the Secretary, MERC (p1). Its practical use for an analyst is as the trigger and cut-off for the 2015 MYT consultation; the substantive provisions sit in the draft and Discussion Paper it points to.
Read with this
Read with this: Multi Year Tariff Regulations, 2015
The regulation
- Dated 8 Dec 2015Multi Year Tariff Regulations, 2015
Amendments and corrections
- Dated 29 Nov 2017Multi Year Tariff Regulations, 2015 — First Amendment, 2017
Commencement notices and reasons
Procedures and orders made under it
- Dated 5 Jan 2016Extension of Time for Filing of Multi Year Tariff Petition by MSETCL under MYT Regulations, 2015 — 2016
- Dated 15 Jan 2016MYT Petition Filing Extension Order, 15 January 2016
- Dated 30 Nov 2017Extension of time for filing of Mid Term Review Petition under the Multi Year Tariff Regulations, 2015 — 30 November 2017
- Dated 26 Dec 2017Extension of time for filing Mid Term Review Petition by Tata Power Generation and Distribution Business, 2017
Earlier drafts
- Released with the notice dated 9 Sep 2015Multi Year Tariff Regulations, 2015 — Draft
- Released with the notice dated 26 Oct 2017Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Draft
- Dated 26 Oct 2017Public notice: Multi Year Tariff Regulations, 2015 — Proposed Amendment, 2017 — Public Notice
- Dated 26 Oct 2017Explanatory memorandum: Multi Year Tariff Regulations, 2015 — First Amendment, 2017 — Explanatory Memorandum — Draft
2 more documents belong here and are not on Voltaic: 2 drafts or notices on a draft not held as English text.
It is also read with
Draft · Public notice on the draft Multi Year Tariff Regulations 2015 — Discussion Paper (FY 2016-17 to FY 2019-20). Voltaic holds no final regulation made from this draft.
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Released with the notice dated 9 Sep 2015Multi Year Tariff Regulations 2015 — Discussion Paper (FY 2016-17 to FY 2019-20)
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.