DERC · Delhi Electricity Regulatory Commission
Renewable Purchase Obligation and Renewable Energy Certificate Framework Implementation Regulations, 2012
Delhi Electricity Regulatory Commission (Renewable Purchase Obligation and Renewable Energy Certificate Framework Implementation) Regulations, 2012
RegulationDated 1 Oct 2012Published in the Gazette 1 Oct 2012No. F. 3(292)/Tariff/DERC/2010-11/3026 dated the 1st October, 2012
Replaced by a later regulation not yet published on Voltaic
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is DERC's principal framework regulation for renewable purchase obligation (RPO) and the REC mechanism in Delhi, notified 1 October 2012 and in force from publication in the Delhi Gazette (p1, p11). It extends to all areas under the Commission's jurisdiction and binds distribution licensees, captive users above 1 MW and open access consumers with contract demand above 1 MW drawing on non-renewable sources (p11, p13).
Clause 2 fixes the vocabulary the rest of the regulation runs on — obligated entity, State Agency, Central Agency, REC, floor and forbearance price, quantum of purchase, renewable energy sources, preferential tariff (p11–13). Clause 4 is the operative core: a minimum renewable share of total consumption, split between a solar-specific obligation and an overall obligation, escalating year by year across the 2012-13 to 2016-17 schedule (p4, p13–14). Its notes cap the cost that may be passed through to tariff, deal with off-grid state subsidy schemes and possible re-fixing of the obligation, preserve power purchase agreements already consented to, and require solar RPO to be met from solar sources.
Clauses 5 and 6 tie compliance to the CERC REC Regulations, 2010 and require a designated State Agency to accredit projects, compile compliance data and publish a monthly cumulative statement (p15–16). Clause 7 covers the distribution licensee's ARR disclosure; clause 8 sets the annual reporting deadline of 30 April for captive users and open access consumers (p17). Clause 9 gives new renewable projects a one-time choice between technology-specific preferential tariff and the REC route, and exempts renewable open access supply from cross-subsidy surcharge to the extent of RPO while expressly denying banking (p17). Clause 10 gives renewable generators open access priority irrespective of installed capacity (p18). Clause 11 sets the default regime: a fund deposit sized on the shortfall and the forbearance price, licence breach for non-deposit, penalty under section 142, and a conditional carry-forward with no credit for excess purchase (p18–19). Clauses 12 to 16 provide for compliance auditors and the Commission's powers to relax, amend, remove difficulties and its savings (p19–20).
Read with this
Proposed changes (drafts with no final yet)
- Dated 1 Feb 2019Draft RPO and REC Framework Implementation Regulations, 2018
- Dated 1 Feb 2019File: Draft Order prescribing Renewable Purchase Obligation, FY 2017-18 to FY 2019-20
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.