Skip to content

APSERC · Arunachal Pradesh State Electricity Regulatory Commission

Terms and Conditions of Intra-State Open Access Regulations, 2026

Arunachal Pradesh State Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations, 2026

Draft regulationDated 18 Mar 2026No APSERC/NOTIFICATION/ .-

Draft

A proposal that has since been finalised as the Intra-State Open Access Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Arunachal Pradesh State Electricity Regulatory Commission (APSERC) issues principal regulations for intra-State open access, made under section 181 of the Electricity Act, 2003 and extending to the whole State (p1). They come into force on Gazette publication; no Gazette date is printed (p1). Chapter 1 defines terms and scope, covering use of intra-State transmission and distribution systems, including when used in conjunction with inter-State transmission (p1–5). Chapter 2 sets connectivity eligibility and procedure: consumers or generators of 5 MW and above connect to the intra-State transmission system; 1 MW to less than 5 MW connect to distribution; below 1 MW connects to distribution; captive plants are exempt from the 5 MW limit for open access (p5–6). It details nodal agencies, application fees, processing, connection agreements, CEA technical standards and timelines (p6–11). Chapter 3 covers eligibility for open access, conditions, continuation of existing entities, and criteria for long-term access, medium-term open access and short-term open access (p11–14). Chapter 4 is the core procedural chapter: categories by system, location and duration; application forms and fees; two large tables for consumers connected to distribution and intra-State transmission systems specifying nodal agency, fees, documents, disposal timelines, charges and losses (p14–31); procedures for LTOA, MTOA and STOA, including bank guarantee, agreements, extension, advance and day-ahead applications and bidding; consent by STU, SLDC or distribution licensee; defaulter applications; other entities; and allotment priority (p32–44). Chapter 5 sets charges: transmission, scheduling and system operation, wheeling, cross-subsidy surcharge, additional surcharge, reactive energy and standby charges (p44–49). Chapter 6 covers scheduling, metering, revision, energy losses and imbalance charge (p49–52). Chapter 8 (there is no Chapter 7) covers billing, collection and disbursement, late payment surcharge, default in payment, payment security and dispute resolution (p52–55). Chapter 9 requires SLDC and STU website disclosures and reports (p55–56). Chapter 10 gives a separate procedure for generating stations connected to distribution systems (p56–57). Chapter 11 covers relinquishment and under-utilisation, capacity availability computation, curtailment priority, removal of difficulties and repeal and savings (p58–62). Annexures provide STOA and LTOA/MTOA application and approval formats, bidding formats and payment schedules (p63–74).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Scheduling and despatch

Read with this

The regulation

Earlier drafts

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document