APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Intra-State Open Access Regulations, 2026
Arunachal Pradesh State Electricity Regulatory Commission (Terms and Conditions of Intra-State Open Access) Regulations, 2026
RegulationDated 15 Jul 2026Published in the Gazette 28 Jul 2026No. APSERC/NOTIFICATION/57/2026 dated The 15th July, 2026
Summary
Summary written by software, from pages 1 to 21 of 38. Check the regulator's original before you rely on it.
This is a principal state regulation issued by the Arunachal Pradesh State Electricity Regulatory Commission on 15 July 2026 and gazetted on 28 July 2026. It establishes the terms and conditions for intra-State open access, extends to the whole State, and comes into force on publication in the official Gazette (p1). Chapter 1 defines core open access terms and limits scope: the regulations apply to open access excluding Green Energy Open Access transactions, which remain governed by the APSERC Green Energy Open Access Regulations, 2024 as amended (p1–2).
Chapter 2 sets connectivity eligibility and process, distinguishing consumers and generators by size and by whether they connect to the intra-State transmission system or the distribution system, and assigning nodal roles to the STU and the Arunachal Pradesh SLDC/distribution licensees (p3–4). Chapter 3 lays down general eligibility conditions, preserves existing licensees, customers and generators under their existing arrangements, and sets the criteria for granting long-term access, medium-term open access and short-term open access (p5–6).
Chapter 4 is the application and approval code. It classifies open access consumers, specifies nodal agencies, forms, fees and processing timelines, and details separate procedures for long-term access, medium-term open access and short-term open access, including open access in advance, day-ahead open access and congestion bidding. It also covers consent by STU/SLDC/distribution licensees, deemed consent, rejection of defaulter applications, applications by non-consumer entities, and allotment priority (p6–20). Chapter 5 begins the charges framework: transmission charges, SLDC scheduling and system operation charges, wheeling charges, cross-subsidy surcharge, additional surcharge and reactive energy charges (p20–21). The text refers to Chapter 10 for distribution-connected generators (p19).
Read with this
Earlier drafts
- Dated 18 Mar 2026Terms and Conditions of Intra-State Open Access Regulations, 2026
- Dated 18 Mar 2026Public notice: Draft Intra-State Open Access Regulations, 2026 — Public Notice
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.