OrderDated 16 Jun 2026
Read with the Himachal Pradesh Electricity Grid Code Regulations, 2026.
Summary
Summary written by software, from pages 1 to 29 of 42. Check the regulator's original before you rely on it.
This is HPERC's finalisation order dated 16.06.2026 (p1) on the draft Himachal Pradesh Electricity Regulatory Commission (Himachal Pradesh Electricity Grid Code) Regulations, 2025. It records the consultation process and then sets out, regulation by regulation, which stakeholder suggestions the Commission accepts, modifies or rejects before notifying the proposed 2026 State Electricity Grid Code. The old State Grid Code, 2008 (notified 5 August 2008, published 11 August 2008) is proposed to be repealed and replaced so as to align with the CERC Indian Electricity Grid Code Regulations, 2023 (p1). The draft was put on the HPERC website, objections were due by 02.02.2026, newspaper notices were published on 04.01.2026, stakeholder letters were sent on 06.01.2026, and a public hearing was held on 16.02.2026 after notices on 07.02.2026 (p1–2). Annexure A lists the hearing participants (p2).
The central recurring issue is HPEMC. The Directorate of Energy asked for HPEMC to be recognised in the Grid Code as a single entity for power management/trading, with roles in RE forecasting, storage, market optimisation, data analytics, OCC participation and transition planning (p3–5). The Commission declines all such suggestions, saying HPEMC's constitution and powers are pending before the Himachal Pradesh High Court in CWP No. 13458 of 2025 and that the Grid Code is made under the Central Electricity Act, so these suggestions cannot be incorporated (p5). The same disposition is repeated for Regulations 43–52 (pp20–29).
On Regulation 3, the Commission drops the ALDC definition and substitutes references with 'distribution licensee' (p6); modifies the definitions of QCA, Share, SSGS and Time Block (pp6–8); retains 'User' but at 33/22 kV and above (p8); adds a State Entity definition with an explanation on sellers (pp8–9); and refuses to add HPEMC (p9).
For Regulations 6, 11, 15 and 17–19, the order makes reference corrections, modifies OCC wording, declines a resource-adequacy liability proviso, retains a five-year intra-State planning outlook, drops category-wise demand forecasting, and leaves Bank Guarantee/connectivity and ex-post facto capex to other processes (pp9–13). Regulations 22–26 are changed for grant of connectivity by STU/distribution licensee, first-time energisation procedure, joint system study timing and telemetry/data communication; payment-withholding suggestions are declined (pp13–17). Protection and generator/transmission line requirements in Regulations 28 and 30 are aligned with CEA regulations and IEGC 2023 (pp17–18). Trial-run and COD provisions in Regulations 34, 37 and 38 are modified for notice, test reports/OEM documents and certificates (pp18–20). Regulations 39–41 update references to CEA Safety Regulations 2023 (p20). Regulation 43 confirms SLDC authority and distribution licensee operation of EHV assets (pp20–21). Regulation 44 receives extensive changes on outage reporting, load variation, AVR, islanding, UFR/pumped storage/ESS, protection coordination, defence mechanisms and OCC/PCC references (pp21–26). Regulation 45 fixes frequency-control provisions (p26). Regulations 46–48 cover operational/outage planning and studies (pp26–27). Regulation 50 real-time operation and Regulations 51–52 demand/load management and load crash are modified (pp28–29).
Read with this
The regulation
- Dated 18 Jun 2026Himachal Pradesh Electricity Grid Code Regulations, 2026
Procedures and orders made under it
- Dated 2 Jul 2026Grid Code Review Committee Constitution Notification, 2026
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.