HPERC · Himachal Pradesh Electricity Regulatory Commission
Himachal Pradesh Electricity Grid Code Regulations, 2026
Himachal Pradesh Electricity Regulatory Commission (Himachal Pradesh Electricity Grid Code) Regulations, 2026
RegulationDated 18 Jun 2026HPERC-Grid Code(388) dated 18th June, 2026
Summary
Summary written by software, from pages 1 to 35 of 110. Check the regulator's original before you rely on it.
This is HPERC's principal state grid code for Himachal Pradesh, notified on 18 June 2026 and made under the Electricity Act, 2003. It replaces the Himachal Pradesh Electricity Grid Code, 2008 and comes into force on publication in Rajpatra, Himachal Pradesh. It extends to the whole State and applies to all Users connected to or using the intra-State transmission system, including STU, SLDC and intra-State transmission licensees. Inter-state transmission is expressly left to the CERC (Indian Electricity Grid Code) Regulations, 2023 (p1–2).
Chapter I (p1–11) sets scope, application and an extensive definitions table. The definitions cover operational concepts such as User, State Entity, Beneficiary, GNA Grantee, connectivity, ancillary services, congestion, transfer capability and system states.
The management chapter (p12–15) makes STU responsible for implementing and enforcing the code and creates a Grid Code Review Committee to manage reviews and amendments, with the Commission approving revisions and directives. It also provides for an Operation and Co-ordination Committee (OCC) and a Protection Co-ordination Committee (PCC), with OCC covering technical/operational issues such as outage plans, SCADA and grid disturbances, and PCC covering protection coordination (p14–15).
Chapter 3 (p16–20) is the Resource Adequacy Code and System Planning Code. It requires integrated resource planning, demand forecasting and resource adequacy planning under the HPERC Framework for Resource Adequacy Regulations, 2025, and STU-led transmission planning. Distribution licensees and State Sector Generating Stations must submit planning data annually, STU prepares a rolling ten-year perspective transmission plan and a five-year plan, and OCC reviews the demand forecasts (p16–20).
Chapter 4 (p21–23) is the Connection/Connectivity Code. It routes connectivity through the HPERC connectivity/LTA/MTOA framework and GNA Regulations, requires compliance with listed CEA standards, provides for connection procedures, joint system studies, connectivity agreements and site responsibility schedules. It also imposes communication and telemetry obligations on Users, including IPPs and distributed energy resources, with availability requirements and penalties or NOC withdrawal for failure to report real-time data to SLDC (p21–24).
Chapter 5 (p24–26) is the Protection Code. It specifies minimum protection principles—reliability, selectivity, speed, stability and sensitivity—fault-clearance expectations by voltage class, and generator/line protection requirements aligned with CEA regulations and the CERC IEGC, 2023.
The Commissioning and Commercial Operation Code (p27–35) covers start-up power, infirm power injection, notice of synchronisation and trial-run, trial-run procedures for thermal, hydro, solar, wind, energy storage, pumped storage and hybrid stations, pre-COD documents and tests, the certificate of successful trial-run, and generating-company declarations.
Read with this
Commencement notices and reasons
Procedures and orders made under it
- Dated 2 Jul 2026Grid Code Review Committee Constitution Notification, 2026
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.