Skip to content

WBERC · West Bengal Electricity Regulatory Commission

West Bengal Open Access Regulations, 2007

West Bengal Electricity Regulatory Commission (Open Access) Regulations, 2007

RegulationDated 12 Apr 2007Published in the Gazette 12 Apr 2007No. 35/WBERC

Replaced by Open Access Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software, from pages 1 to 22 of 28. Check the regulator's original before you rely on it.

The West Bengal Electricity Regulatory Commission (Open Access) Regulations, 2007, issued as No. 35/WBERC dated 12.04.2007, create the State-level framework for open access on intra-State transmission and distribution systems. They replace the 2005 open access regulations, start on Gazette publication, and override inconsistent earlier regulations or orders (p1, p3).

Regulations 1–3 set the title, commencement, definitions and scope. They define the open access customer, open access source, long-term access (15 years or more), short-term access (not exceeding four months at a stretch), backup/standby/incidental/start-up power, connected licensee and nodal agency (p1–3). Regulations 4–9 then set eligibility and disqualifications, special continuation for existing distribution licensees, a descending allotment priority by source/category, criteria for assessing available network capacity, a same-licensee payment route, and nodal agency roles — STU/licensee for long-term and SLDC for short-term, emergency and trial-run access (p4–6).

Regulations 10–13 provide the process: application formats and fees, long-term and short-term processing timelines, bidding for congested short-term capacity, agreements, deemed cancellation for non-execution or non-utilisation, surrender and reassignment (p7–13). Regulations 14–19 specify the charge heads and payment mechanics — transmission, wheeling, reactive energy, SLDC fees, unscheduled interchange, access charges, cross-subsidy and additional surcharge, technical loss allocation, metering and commercial conditions (p14–20). Regulations 20–26 cover grid discipline, curtailment priority, licensee obligations, information publication, obligations under sections 11 and 23 of the Act and Commission intervention (p20–21). Regulations 28–30 provide dispute resolution, amendment power and repeal with savings (p22).

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Congestion and curtailment

Read with this

Amendments and corrections

Commencement notices and reasons

Earlier drafts

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document