Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Open Access Regulations, 2022

West Bengal Electricity Regulatory Commission (Open Access) Regulations, 2022

RegulationDated 1 Aug 2022Published in the Gazette 3 Aug 2022No. 75/WBERC dated 01.08.2022

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software, from pages 1 to 19 of 48. Check the regulator's original before you rely on it.

This is the West Bengal Electricity Regulatory Commission (Open Access) Regulations, 2022, notified as No. 75/WBERC dated 1 August 2022 and published in the Kolkata Gazette, Extraordinary on 3 August 2022 (p3). They are made under the Electricity Act, 2003, sections 181, 39(2)(d), 40(c), 42(2)–(4) and 66, and in supersession of notification No. 35/WBERC dated 12 April 2007 and all its amendments (p3). They come into force on Gazette publication and apply to open access customers and applicants embedded in the State grid (p3). The contents list 38 regulations and a Schedule plus three formats (pp1–2).

Regulation 2 supplies the definitions, including open access customer, open access consumer, open access source, backup and emergency power, critical load, green energy open access, nodal agency, safe capacity, ATACA/AWACA and references to the State Grid Code, DSM Regulations, Tariff Regulations, Green OA Rules and CERC regulations (pp3–8). Regulation 3 applies the regulations to intra-state transmission and/or distribution systems, gives them overriding effect over earlier instruments, and extends the open access discipline to dedicated-transmission-line and captive arrangements not using the grid, including scheduling, cross-subsidy surcharge, additional surcharge, backup/emergency power and electricity duty (pp8–9).

Regulation 4 sets eligibility: licensees, generating companies, captive plants, consumers and suppliers; green energy open access for consumers with contracted demand or sanctioned load of 100 kW and above and no load limitation for captive consumers; connectivity and ABT metering requirements; a 24x7 control room for 33 kV and above; exclusions for theft proceedings, disconnection notices and outstanding dues; and critical-load backup-power conditions that can be triggered by government or court directions (pp8–10). Regulation 5 preserves existing distribution licensees’ access under existing agreements and requires informal arrangements to be formalised within one month (pp10–11). Regulation 6 sets allocation priority among long-term, medium-term and short-term customers, distribution licensees, collective power-exchange transactions and non-fossil-fuel sources (p11). Regulation 7 gives the technical-feasibility criteria and formulas for computing available open access capacity in transmission and distribution (pp11–13). Regulation 8 makes the STU nodal agency for long-term and medium-term access and SLDC nodal agency for short-term access (p13).

Regulation 9 covers the application procedure, Format-1, non-refundable application fees in Table-1, undertakings about multiple PPAs and section 35 intervening-transmission applications (pp13–15). Regulation 10 sets the long-term open access procedure, including interstate coordination, a state-grid-only timeline, bank guarantee of Rs 10,000 per MW, consultation and consent/refusal timelines and system-strengthening cost handling (pp15–17). Regulation 11 sets the medium-term procedure, including the application window, no-augmentation rule, consultation and consent timelines (pp17–18). Regulation 12 begins the short-term procedure, including ALDC consultation and monthly advance reservation (pp18–25 per contents. The remaining contents entries cover power exchange, limitations, agreements, charges, energy accounting, payment security, metering, curtailment, dispute resolution, repeal and savings, followed by Schedule-1 and Formats 1, 2 and 2A (pp1–2, 13–39, 40–46).

Standard name
Open Access Regulations, Green Energy Open Access Regulations
Primary topics
Open access, Open access charges, Green energy open access

Read with this

Commencement notices and reasons

Proposed changes (drafts with no final yet)

Earlier drafts

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document