MPERC · Madhya Pradesh Electricity Regulatory Commission
Power Purchase and Procurement Process Regulations, 2023
Madhya Pradesh Electricity Regulatory Commission (Power Purchase and Procurement Process) Regulations, 2023 {RG-19(II) of 2023}
RegulationDated 17 Feb 2023No. 378/ MPERC-2022 dated 17th February 2023
A later regulation on Voltaic changes some of its provisions: Framework for Resource Adequacy Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MPERC's revision of its power purchase and procurement process regulations, replacing the 2006 Revision-1 instrument (p1, p9). It applies to every Distribution Licensee in Madhya Pradesh and to all power purchases — conventional and renewable — that a licensee makes or proposes to make (p1). It comes into force on Gazette publication; the Gazette date is not printed in this text (p1).
Parts I–II set the application and the working definitions, notably the term-based split of procurement into long-term (over five years), medium-term (over three months up to five years) and short-term (up to three months) (pp1–2). Part III requires each licensee to prepare a rolling five-year power procurement plan optimising supply resources, and lists the source categories to be considered, including state, central, IPP and captive plants, renewables and co-generation, traders, power exchange purchases, storage (battery and pumped storage) and banking with other states (pp2–3).
Part IV is the operative core: an annual submission deadline and initial plan aligned to the MYT control period; the content of the plan (category-wise sales, availability assessment, demand–supply gap, RPO-linked renewable quantum, deviation reporting); and detailed methods for demand forecasting — historical trends, CAGR, load research, IT tools such as PEUM or econometric models, optional AI/machine-learning tools, festival and seasonal effects, agriculture load factors, storage, EV charging, open access, energy efficiency and DSM — and for assessing availability through PAF, CUF, hydro and auxiliary-consumption norms (pp3–7). It also makes new capacity tie-ups, new long/medium-term PPAs/PSAs and their amendments subject to prior Commission approval, with short-term purchases reported within 45 days (pp6–7).
Parts V–VIII cover in-year variations and emergency short-term procurement, website disclosure of procurement and merit-order data by licensees and SLDC, creation of planning and round-the-clock procurement cells with Commission-apprised guidelines, and consultation with generators, other licensees, MPPMCL, load dispatch centres and CEA (pp7–8). Part IX provides for penalties and suo-motu action on non-compliance, orders and practice directions, removal of difficulties, amendment power, and supersession of the 2006 Regulations (pp8–9). The annexures are ten blank formats for the annual plan and deviation statements (pp10–19).
Read with this
Amendments and corrections
- Dated 5 Mar 2024Changes some provisions: Framework for Resource Adequacy Regulations, 2024
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.