RERC · Rajasthan Electricity Regulatory Commission
Metering Regulations, 2007
Rajasthan Electricity Regulatory Commission (Metering) Regulations 2007
RegulationDated 29 May 2007No.RERC/Secy/Reg 70 dated 29.05.2007
1 amendment to it is on Voltaic, dated 10 May 2013.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Rajasthan Electricity Regulatory Commission issued these metering regulations on 29 May 2007 under section 50 read with section 181(zp) of the Electricity Act 2003 (p1). They supplement the Central Electricity Authority (Installation and Operation of Meters) Regulations 2006 and are meant to bring uniform metering practice among licensees, generating companies and other stakeholders in Rajasthan; where the state regulations conflict with the CEA meters regulations, the CEA regulations prevail (p1–2).
The opening regulations set the short title, commencement on Gazette publication, and the end of the existing distribution-licensee metering codes and the transmission metering code that formed part III of the state grid code (p1). Regulation 2 defines technical and data-system terms such as apparent energy, base computer, central data collection system, common meter reading instrument, data concentrator, demand period/values, load survey, maximum demand, metering system, NABL, remote transmitting unit, settlement in-station and transducer; undefined terms take their meaning from the CEA meters regulations, the State Grid Code and the Act (p1–2).
Regulations then deal with standards, ownership, metering facilities, meter types and capability, instrument transformers and meter memory (p2–5). They specify who must keep meters intact and when consumers may provide their own meter, the space and access obligations at generating stations, licensee premises and consumer premises, and the requirements for interface meters and energy accounting/audit meters — draw-out modular construction, CT shorting, test terminal blocks, power supply, clock battery, configurable software, harmonic measurement, demand-period synchronisation and read-only interrogation (p3–4). Consumer meters are classified into types with specifications in Annexure-2, and additional meters must match the main meter's accuracy (p3–4). Instrument transformer requirements cover standard compliance, accuracy, burden, dedicated metering cores, error checking, type and secondary ratings, and fuse removal; meter memory retention and retrieval rules are also set (p4–5).
Inspection, testing and calibration provisions give laboratory and site procedures, reference-equipment classes, routine testing periodicity for interface, accounting/audit, consumer and instrument transformers, NABL accreditation, joint inspection for interface meters, sealing and test reporting (p5–6). Metering system requirements cover interface meter locations for open access and mini hydel, communication modems and data interoperability, GPS-based time synchronisation, consumer meter location, meter boxes/cabinets, wiring and HT metering arrangements (p6–7). Meter reading and data collection are addressed, with interface meter procedure to be specified separately by Commission order and consumer reading governed by the Supply Code (p7–8).
Operations and maintenance responsibilities are allocated among distribution licensees, STU and generating companies, with seal-breaking and reporting duties (p8). Sealing rules require testing, installation and sealing by the licensee or an accredited laboratory, additional CT/PT secondary sealing, phased replacement of old seals and seal-tracking software (p8–9). Meter replacement is tied to the schedule in Annexure-III (p9, p20–21). The regulations also require introduction of prepaid/ToD/ToU meters for temporary and festival connections and permit configurable ToD registers (p9); set dispute-resolution routes for metering accuracy, consumer grievances, inter-utility disputes and billing precedence for defective interface meters (p9); and provide for RTUs/transducers for SLDC/sub-LDC data acquisition, quality assurance plans, and a metering committee to review the regulations (p9–10).
Annexure-1 gives minimum acceptable specifications for interface and energy accounting/audit meters (p11–14); Annexure-2 gives salient technical specifications for consumer meters (p15–19); Annexure-3 gives the time schedule for replacing existing meters and instrument transformers (p20–21).
Read with this
Amendments and corrections
- Dated 10 May 2013Metering (1st Amendment) Regulations, 2013
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.