Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Metering (1st Amendment) Regulations, 2013

Rajasthan Electricity Regulatory Commission (Metering) (1st Amendment) Regulations, 2013

AmendmentDated 10 May 2013No.RERC/Secy/Reg. 97 dated 10th May, 2013

Amends the Metering Regulations, 2007.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a three-page amendment notification issued by the Rajasthan Electricity Regulatory Commission on 10 May 2013, amending the Commission's Metering Regulations. It changes seven provisions of the principal regulations plus a table in Annexure-1; it does not restate the principal regulations and creates no stand-alone obligations.

The largest change substitutes the table in Regulation 4 (p1), which lists the Indian Standards and CBIP publications that metering equipment must conform to — covering AC static watt-hour meters, transformer-operated watt-hour and VAR meters, current and voltage transformers, capacitor voltage transformers, common meter reading instruments, an installation/maintenance code of practice and a data-exchange specification.

Regulation 7 is amended by deleting one sub-regulation and adding a proviso for installations where DC supply is not available, requiring self-powered interface meters with non-volatile memory and battery back-up (p2). Regulation 8(6)(ii) is amended to permit an additional current rating for meters (p2). A new sub-regulation 11(1)(a)(ii) prescribes where main, check and standby meters are to be installed for open access consumers who lack a dedicated feeder, with the existing clause renumbered as (iii) (p2). Regulation 17(1) replaces the need for Commission approval of testing agencies with a requirement of valid accreditation for the specific purpose and service (p2), and Regulation 20(1)(a) changes the designated RVPN officer to Chief Engineer (M,P&S)/Chief Engineer in charge of Metering (p2). Annexure-1's meter specification table is trimmed of certain voltage-condition reactive energy measurands, one CBIP publication reference is swapped, and an IS data-exchange standard is added (pp2–3).

Standard name
Metering Regulations
Primary topics
Metering, Technical standards

Read with this

The regulation

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document