DERC · Delhi Electricity Regulatory Commission
Business Plan Regulations, 2017 — Draft
Delhi Electricity Regulatory Commission (Business Plan) Regulations, 2017
Draft regulationDated 8 Jun 2017F.3(512)/Tariff/DERC/2016-17/5750 dated 8 June, 2017
Draft
A proposal that has since been finalised as the Business Plan Regulations, 2017.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Delhi Electricity Regulatory Commission issued this draft notification on 8 June 2017 (p2), proposing the DERC (Business Plan) Regulations, 2017 under Section 181 read with Sections 61 and 86(1)(b) of the Electricity Act, 2003 (p2). The regulations are to run for three financial years — FY 2017-18, FY 2018-19 and FY 2019-20 — unless reviewed earlier, and apply to the whole National Capital Territory of Delhi (p2). Part 1 gives short title, validity and extent, and adopts definitions from the DERC (Terms and Conditions for Determination of Tariff) Regulations, 2017 (p2–3).
For generating entities (p3–5), the draft fixes base return on equity, a tax gross-up formula, a margin over SBI's one-year MCLR for loan interest, normative O&M and R&M expenses, a tentative capital investment plan for a gas turbine station, operating norms such as NAPAF/NAPLF, gross station heat rate and auxiliary consumption, and an incentive for generation above the normative load factor.
For the transmission licensee (p6–8), it sets similar return and loan-margin treatment, bay-wise and circuit-km O&M norms, a capital investment plan, a normative annual transmission availability threshold, and a monthly transmission-charge formula that steps with availability. Appendices I–III (p22–26) give the element-wise availability calculation procedure, surge impedance loading values for AC lines, and availability formulae.
Part 4 (p9–21) covers the distribution licensees BRPL, BYPL, TPDDL and NDMC. It specifies separate wheeling and retail return on equity, carrying cost, tax gross-up, licensee-specific loan margins, O&M norms, own-consumption treatment, capitalisation plans and true-up with a variation threshold, distribution-loss targets and over/under-achievement sharing, collection-efficiency targets, RPO targets and non-compliance penalty, a deviation-settlement contingency limit, surplus-power sale incentive sharing, power purchase cost adjustment mechanism, re-financing incentive sharing, ARR allocation between wheeling and retail, and revenue gap/surplus treatment.
Part 5 (p21) gives the Commission powers to issue practice directions, remove difficulties, relax provisions, interpret the regulations, preserve inherent powers, conduct enquiries through the 2001 Conduct of Business Regulations, and amend the regulations.
Read with this
The regulation
- Dated 31 Aug 2017Business Plan Regulations, 2017
Commencement notices and reasons
- Dated 6 Oct 2017Business Plan Regulations, 2017 — Statement of Reasons
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.