Business Plan Regulations, 2017

Delhi Electricity Regulatory Commission (Business Plan) Regulations, 2017

RegulationDated 31 Aug 2017F.3(512)/Tariff/DERC/2016-17/5750 dated 31 August, 2017

Replaced by Business Plan Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

DERC's Business Plan Regulations, 2017, notified on 31 August 2017 (p2), fix the business-plan parameters the Commission will use when approving the three-year control-period filings of Delhi's generating entities, transmission licensees and distribution licensees — the operational numbers behind the DERC (Terms and Conditions for Determination of Tariff) Regulations, 2017, to which almost every regulation cross-refers.

The instrument is time-boxed: it remains in force for three years covering FY 2017-18, FY 2018-19 and FY 2019-20 unless reviewed earlier, may be extended, and its operational norms may be extended with it; on extension, the distribution-loss reduction target for the extended period is left to be determined by the Commission (p2). It applies across the National Capital Territory of Delhi (p2) and defines almost nothing itself, importing definitions from the Tariff Regulations and the Act (p2–3).

Part 1 is preliminary (p2–3). The generating-entity part (p3–6) sets return on equity and its grossing-up for tax, the margin on loan interest, normative O&M and additional R&M expense heads, a tentative capital-investment plan for the gas turbine station, operating norms (availability, load factor, heat rate, auxiliary consumption), an incentive for generation above the normative load factor, an incentive-sharing formula for loan re-financing, and a carry-over of the 2007 norms for the Rithala combined-cycle plant. The transmission part (p7–10) mirrors the RoE, tax, interest-margin and O&M treatment, adds bay-wise and circuit-km norms, a capital plan, a normative transmission availability factor, a transmission-charge formula keyed to monthly availability, and refinancing incentive sharing.

Part 4 for distribution licensees (p11–23) is the largest: separate wheeling and retail returns, interest margin, discom-wise O&M and capitalisation norms, auxiliary consumption treatment, distribution-loss targets with over/under-achievement sharing, collection-efficiency targets, RPO targets and penalties, DSM contingency limits, surplus-power sale incentive sharing, PPAC recovery mechanics, ARR allocation ratios between wheeling and retail business, revenue gap treatment, and a pointer to a separate ToD tariff order.

Part 5 (p24) is the administrative tail — directions, difficulty removal, relaxation, interpretation, saving of inherent powers, enquiry procedure and amendment power. Appendices I–III (p25–29) give the transmission availability computation procedure, surge impedance loading values and category-wise availability formulae.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Capital cost and investment, Operating costs and other income

Read with this

Commencement notices and reasons

Earlier drafts

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗