DERC · Delhi Electricity Regulatory Commission
Business Plan Regulations, 2017
Delhi Electricity Regulatory Commission (Business Plan) Regulations, 2017
RegulationDated 31 Aug 2017F.3(512)/Tariff/DERC/2016-17/5750 dated 31 August, 2017
Replaced by Business Plan Regulations, 2019
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
DERC's Business Plan Regulations, 2017, notified on 31 August 2017 (p2), fix the business-plan parameters the Commission will use when approving the three-year control-period filings of Delhi's generating entities, transmission licensees and distribution licensees — the operational numbers behind the DERC (Terms and Conditions for Determination of Tariff) Regulations, 2017, to which almost every regulation cross-refers.
The instrument is time-boxed: it remains in force for three years covering FY 2017-18, FY 2018-19 and FY 2019-20 unless reviewed earlier, may be extended, and its operational norms may be extended with it; on extension, the distribution-loss reduction target for the extended period is left to be determined by the Commission (p2). It applies across the National Capital Territory of Delhi (p2) and defines almost nothing itself, importing definitions from the Tariff Regulations and the Act (p2–3).
Part 1 is preliminary (p2–3). The generating-entity part (p3–6) sets return on equity and its grossing-up for tax, the margin on loan interest, normative O&M and additional R&M expense heads, a tentative capital-investment plan for the gas turbine station, operating norms (availability, load factor, heat rate, auxiliary consumption), an incentive for generation above the normative load factor, an incentive-sharing formula for loan re-financing, and a carry-over of the 2007 norms for the Rithala combined-cycle plant. The transmission part (p7–10) mirrors the RoE, tax, interest-margin and O&M treatment, adds bay-wise and circuit-km norms, a capital plan, a normative transmission availability factor, a transmission-charge formula keyed to monthly availability, and refinancing incentive sharing.
Part 4 for distribution licensees (p11–23) is the largest: separate wheeling and retail returns, interest margin, discom-wise O&M and capitalisation norms, auxiliary consumption treatment, distribution-loss targets with over/under-achievement sharing, collection-efficiency targets, RPO targets and penalties, DSM contingency limits, surplus-power sale incentive sharing, PPAC recovery mechanics, ARR allocation ratios between wheeling and retail business, revenue gap treatment, and a pointer to a separate ToD tariff order.
Part 5 (p24) is the administrative tail — directions, difficulty removal, relaxation, interpretation, saving of inherent powers, enquiry procedure and amendment power. Appendices I–III (p25–29) give the transmission availability computation procedure, surge impedance loading values and category-wise availability formulae.
Read with this
Commencement notices and reasons
- Dated 6 Oct 2017Business Plan Regulations, 2017 — Statement of Reasons
Earlier drafts
- Dated 8 Jun 2017Business Plan Regulations, 2017 — Draft
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.