Biomass and Non-Fossil Fuel Based Co-generation Tariff Regulations, 2010

Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Tariff Determination for Biomass and nonfossil fuel based co-generation projects) Regulations, 2010

RegulationDated 27 Jan 2010Published in the Gazette 28 Jan 2010No. 24 dated The 27th January, 2010

Replaced by Biomass, Biomass Gasifier and Non-Fossil Fuel Based Cogeneration Tariff Regulations, 2016

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Jharkhand State Electricity Regulatory Commission issued this principal regulation under the Electricity Act 2003 to set terms and conditions for tariff determination for biomass and non-fossil fuel based co-generation projects in Jharkhand (p1). It extends to the whole state and applies to biomass power projects and non-fossil fuel based co-generation plants using such fuels (p1). Eligibility is defined in A3: biomass power projects must use new plant and machinery based on Rankine cycle with minimum steam pressure 62 bar and above, and fossil fuel use is restricted to 15% of total fuel consumption annually; non-fossil fuel based co-generation projects must have minimum steam pressure 40 bar and above and satisfy sum of useful power output and one half of useful thermal output greater than 45% of facility energy consumption during season (p5). Stand-alone biomass and co-generation projects supplying rural areas are outside regulator-determined tariffs (p6).

After definitions (p2–4), A4 states the tariff principles: cost-plus, benchmark tariff, two-part tariff recovering fixed and variable costs (p6–7). It identifies tariff determinants and specifies normative treatment of capital cost including indexation, PLF, auxiliary consumption, calorific value, fuel cost, station heat rate, O&M, working capital, interest, depreciation and return on equity (p7–12). Table 1 at p11 compiles cost parameters by technology. A5 covers other key drivers: JREDA site allocation and periphery restrictions, monitoring fossil fuel use, wheeling discount, banking, balancing and settlement, minimum purchase/renewable energy obligation, evacuation infrastructure cost by STU, CDM benefit sharing, state financial benefits, single-window clearance and a 13-year tariff period (p12–16). Table 2 at p14 is headed REO for Jharkhand from FY 2011 to FY 2015. A6–A8 provide powers to remove difficulties, amend, and savings (p16). Control period starts on Gazette publication and ends 31.03.2015; in-force date is publication in Jharkhand Gazette, with page header date 28 January 2010 (p1–2).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Tariff determination, Renewable energy tariff, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.