APSERC · Arunachal Pradesh State Electricity Regulatory Commission
Deviation Settlement Mechanism and Related Matters Regulations, 2026
Arunachal Pradesh State Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2026.
RegulationDated 16 Feb 2026Published in the Gazette 16 Mar 2026No. APSERC/Notification/55/2026 dated The 16th February, 2026
Summary
Summary written by software. Check the regulator's original before you rely on it.
APSERC's (Deviation Settlement Mechanism and Related Matters) Regulations, 2026 are the Arunachal Pradesh Commission's intra-state commercial discipline code for grid users — the mechanism that prices any gap between what a seller injects or a buyer draws and what was scheduled. They were made under ss.32(3), 33(4), 86(1) and 181 of the Electricity Act 2003 and notified as No. APSERC/Notification/55/2026 dated 16 February 2026, published in the Arunachal Pradesh Gazette Extraordinary of 16 March 2026 (p1). Under Reg 1(iii) they commence from Gazette notification, with commercial arrangements, deviation charges and penal action carved out; Reg 16(i) restates commencement from publication and adds that they remain in force until amended (p1, p11).
Regulation 3 does the heavy lifting: roughly forty definitions — deviation, WS / general / MSW sellers, run-of-river hydro, available capacity, contract rate, reference charge rate, area clearing price, QCA, State Entity, State Deviation Pool Account and gaming (p1–3). Applicability (p4) covers all intra-state buyers, including distribution licensees and open access consumers, and all sellers with installed capacity of 1 MW and above — renewable, open access and captive (excluding in-situ captive) — with the threshold to be revised later by separate notification.
Reg 7 sets out how deviation is computed for general sellers, wind/solar/hybrid sellers and buyers, defines the 96-block 15-minute scheduling day, and lays down scheduling and despatch guiding principles — buyer-wise merit-order despatch, treatment of wheeling transactions, and SLDC real-time interventions consistent with the CERC DSM Regulations, 2024 (p4–5). Reg 8 fixes the normal rate of deviation charge as the highest of three exchange-derived components (p5–6).
Reg 9 is the operational core and the longest part (p6–9): frequency-linked charge tables for general sellers; frequency-free regimes for run-of-river hydro, municipal-solid-waste and wind/solar/hybrid sellers with volume limits that tighten from 1 April 2026; aggregation at pooling stations through a QCA; standalone storage and storage co-located with renewables; buyer-side tables for over- and under-drawal; and treatment of infirm power, start-up power and forced outages.
The back half is settlement plumbing. Reg 10 covers monthly SDSMA billing by SLDC and the contents of the bill (p9); Reg 11 the State Deviation Pool Account, its credits and debits, and use of surplus for grid improvement (p9–10); Reg 12 state energy accounting and the accounting procedure to be approved by the Commission within three months (p10–11); Reg 13 payment timelines, late payment surcharge, letter-of-credit cover for defaulters and escalation to s.142 action (p11); Reg 14 reactive energy; Reg 15 compliance with SLDC instructions; Reg 16 transition, with mock trials within six months (p11). Regs 17–21 cover gaming and the Commission's powers to relax, amend, remove difficulty and interpret (p11–12).
Read with this
Earlier drafts
- Dated 11 Dec 2025Deviation Settlement Mechanism and Related Matters Regulations, 2025 — Draft
- Dated 11 Dec 2025Public notice: Public Notice — Draft Deviation Settlement and Related Matters Regulations, 2025
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APSERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.