Deviation Settlement Mechanism and Related Matters Regulations, 2025 — Draft

Arunachal Pradesh State Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2025

Draft regulationDated 11 Dec 2025

Draft

A proposal that has since been finalised as the Deviation Settlement Mechanism and Related Matters Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on apserc.nic.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This draft instrument is the Arunachal Pradesh State Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2025. It is framed for intra-state entities in Arunachal Pradesh and creates a commercial deviation settlement regime to keep grid users to schedule (p1, p5). It applies to buyers such as distribution licensees, deemed distribution licensees and open access consumers, and to sellers of 1 MW and above, including renewable, open access and captive generators connected to the intra-state transmission or distribution system, excluding in-situ captive generators (p5). The Commission may revise that threshold separately in stages (p5).

The regulation defines key actors and price references — general sellers, WS sellers, MSW sellers, RoR hydro, QCA, standalone ESS, ACP, contract rate, reference charge rate and normal rate (p2–4). It places duties on SLDC and state entities on scheduling, contracts, connection agreements, metering and despatch, with SLDC instructions binding (p5–6). Regulation 7 gives formulas for computing deviation in MWh and percent for general sellers, WS sellers and buyers; for WS sellers the denominator and volume limits change after 31.03.2026, with an X factor to be stipulated later (p6–7).

Regulation 8 specifies the normal rate as the highest of IDAM ACP, RTM ACP or a composite of ACPs and ancillary service charges (p7–8). Regulation 9 sets category-specific charges for deviation for general sellers, RoR stations, MSW, WS sellers, standalone ESS and buyers, using frequency bands and volume limits, covering infirm power, start-up power and forced outage (p8–12). Regulations 10–12 establish SDSMA billing, the State Deviation Pool Account, its credits, charges, surplus use and State Energy Accounting (p12–15). Regulation 13 sets payment timelines, late payment surcharge, letter of credit and penal action for default (p15). Regulation 14 covers reactive energy; Regulation 15 requires compliance with SLDC instructions; Regulation 16 provides transition timelines; Regulation 17 deals with gaming; Regulations 18–21 give relaxation, amendment, removal-of-difficulty and interpretation powers (p15–17). Commencement is on Gazette notification, but no Gazette date is printed (p1, p16).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Scheduling and despatch

Read with this

Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on apserc.nic.in ↗

Report an issue with this document