Rooftop Solar Grid Interactive Systems Based on Net-Metering Regulations, 2015

BERC (Rooftop Solar Grid Interactive Systems Based on Net-Metering) Regulations 2015

RegulationDated 6 Jul 2015Published in the Gazette 7 Jul 2015BERC-SMP No.-5/2015 dated The 6th July, 2015

Replaced by Rooftop Solar Net and Gross Metering Regulations, 2018

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Bihar Electricity Regulatory Commission's Rooftop Solar Grid Interactive Systems Based on Net-Metering Regulations, 2015 (BERC-SMP No.-5/2015) create the framework for consumer-side rooftop solar connected to a distribution licensee's network in Bihar on net-metering terms. The notification is dated 6 July 2015 and appears in the Bihar Gazette Extraordinary of 7 July 2015 (p1); it takes effect from the date of notification in the Official Gazette (p1).

Regulations 1–2 (p1–3) fix title, extent and commencement and supply the vocabulary — eligible consumer, net meter, solar meter, contracted load, settlement period, obligated entity and so on — with undefined expressions falling back on the Electricity Act (p3). Regulations 3–6 (p3–4) set scope and eligibility: the regulations bind the distribution licensee and its consumers; a system must sit within a permitted capacity band (not less than one kWp and not more than one MWp), be located in the consumer's premises, and operate in parallel with the licensee's network. They impose a duty on the licensee to offer net metering on a non-discriminatory, first-come-first-serve basis, subject to yearly cumulative capacity targets and a per-distribution-transformer share ceiling that the licensee must publish on its website and report to the Commission.

Regulation 7 (p4) requires interconnection and metering to follow CEA regulations on distributed generation, safety and meters, addresses battery-backed systems and manual isolation, splits operation-and-maintenance responsibility at the net meter, and gives the licensee a right to disconnect. Regulation 8 (pp4–5) is the commercial core: billing-period accounting of injection, supply, net billed energy and carried-forward credit; time-of-day compensation within time blocks; treatment of excess generation at the end of a settlement period (including the ceiling on generation relative to consumption, no payment for the excess, and resetting of carried-over injection); and a dispute route through the consumer grievance redressal forum and then the Commission. Regulations 9–11 (pp5–6) credit rooftop solar consumption towards the licensee's Solar RPO, exempt net-metered systems from banking, wheeling and cross-subsidy charges while barring net-metering consumers from banking, and route REC issuance to the CERC framework. Regulation 12 (p6) details metering, including mandatory check meters for larger installations. Regulations 13–16 (p6) tie penalty to the standards-of-performance regulations and give the Commission powers to direct, relax and amend.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Energy accounting and settlement, Metering

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document