Summary
Summary written by software. Check the regulator's original before you rely on it.
The Bihar Electricity Regulatory Commission's Rooftop Solar Grid Interactive Systems Based on Net-Metering Regulations, 2015 (BERC-SMP No.-5/2015) create the framework for consumer-side rooftop solar connected to a distribution licensee's network in Bihar on net-metering terms. The notification is dated 6 July 2015 and appears in the Bihar Gazette Extraordinary of 7 July 2015 (p1); it takes effect from the date of notification in the Official Gazette (p1).
Regulations 1–2 (p1–3) fix title, extent and commencement and supply the vocabulary — eligible consumer, net meter, solar meter, contracted load, settlement period, obligated entity and so on — with undefined expressions falling back on the Electricity Act (p3). Regulations 3–6 (p3–4) set scope and eligibility: the regulations bind the distribution licensee and its consumers; a system must sit within a permitted capacity band (not less than one kWp and not more than one MWp), be located in the consumer's premises, and operate in parallel with the licensee's network. They impose a duty on the licensee to offer net metering on a non-discriminatory, first-come-first-serve basis, subject to yearly cumulative capacity targets and a per-distribution-transformer share ceiling that the licensee must publish on its website and report to the Commission.
Regulation 7 (p4) requires interconnection and metering to follow CEA regulations on distributed generation, safety and meters, addresses battery-backed systems and manual isolation, splits operation-and-maintenance responsibility at the net meter, and gives the licensee a right to disconnect. Regulation 8 (pp4–5) is the commercial core: billing-period accounting of injection, supply, net billed energy and carried-forward credit; time-of-day compensation within time blocks; treatment of excess generation at the end of a settlement period (including the ceiling on generation relative to consumption, no payment for the excess, and resetting of carried-over injection); and a dispute route through the consumer grievance redressal forum and then the Commission. Regulations 9–11 (pp5–6) credit rooftop solar consumption towards the licensee's Solar RPO, exempt net-metered systems from banking, wheeling and cross-subsidy charges while barring net-metering consumers from banking, and route REC issuance to the CERC framework. Regulation 12 (p6) details metering, including mandatory check meters for larger installations. Regulations 13–16 (p6) tie penalty to the standards-of-performance regulations and give the Commission powers to direct, relax and amend.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.