Rooftop Solar Net and Gross Metering Regulations, 2018

the Commission (Rooftop Solar Grid Interactive Systems Based on Ne and Gross Metering) Regulations, 2018

RegulationDated 2 Apr 2018Published in the Gazette 3 Apr 2018SMP No.-36/2017-01

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Bihar Electricity Regulatory Commission's 2018 framework for grid-connected rooftop solar in the State, notified on 2 April 2018 and carried in the Bihar Gazette (Extraordinary) of 3 April 2018 (p1). It replaces the Commission's 2015 rooftop net-metering regulations (p8) and comes into force from the date of gazette notification (p1).

It applies to the distribution licensee and to "eligible consumers" — consumers who install rooftop PV at their own premises to offset their own requirement, whether self-owned or third-party owned (p2–4). Projects must fall inside a capacity band: not less than one kWp and not more than the consumer's sanctioned/contracted load (p4); the State Government may still take up larger rooftop projects through other mechanisms (p4). The licensee must offer net or gross metering on a non-discriminatory, first-come-first-served basis and publish connection guidelines within three months (p4), working within yearly capacity ceilings set by the Commission and distribution-transformer-level limits it must report annually (p4).

Regulation 8 is the operational heart. Under net metering, each bill shows injection, supply, net billed energy and carried-forward credit; excess injection rolls forward within the settlement year but is neither paid for nor carried beyond it, and credit can offset only energy, not other charges (p5–6). Under gross metering, the licensee buys all injected energy at the Commission-approved feed-in tariff and settles with the consumer or third-party owner (p6).

The remaining regulations cover grid interconnection and metering standards (p5, p7), extension of solar RPO benefit to the licensee for eligible-consumer generation (p6–7), non-discriminatory open access with exemption from banking, wheeling and cross-subsidy charges (p7), REC eligibility (p7), compensation and penalty for metering failure (p8), and the Commission's powers to direct, remove difficulties and amend (p8).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Metering

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document