BERC · Bihar Electricity Regulatory Commission
Rooftop Solar Net and Gross Metering Regulations, 2018
the Commission (Rooftop Solar Grid Interactive Systems Based on Ne and Gross Metering) Regulations, 2018
RegulationDated 2 Apr 2018Published in the Gazette 3 Apr 2018SMP No.-36/2017-01
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Bihar Electricity Regulatory Commission's 2018 framework for grid-connected rooftop solar in the State, notified on 2 April 2018 and carried in the Bihar Gazette (Extraordinary) of 3 April 2018 (p1). It replaces the Commission's 2015 rooftop net-metering regulations (p8) and comes into force from the date of gazette notification (p1).
It applies to the distribution licensee and to "eligible consumers" — consumers who install rooftop PV at their own premises to offset their own requirement, whether self-owned or third-party owned (p2–4). Projects must fall inside a capacity band: not less than one kWp and not more than the consumer's sanctioned/contracted load (p4); the State Government may still take up larger rooftop projects through other mechanisms (p4). The licensee must offer net or gross metering on a non-discriminatory, first-come-first-served basis and publish connection guidelines within three months (p4), working within yearly capacity ceilings set by the Commission and distribution-transformer-level limits it must report annually (p4).
Regulation 8 is the operational heart. Under net metering, each bill shows injection, supply, net billed energy and carried-forward credit; excess injection rolls forward within the settlement year but is neither paid for nor carried beyond it, and credit can offset only energy, not other charges (p5–6). Under gross metering, the licensee buys all injected energy at the Commission-approved feed-in tariff and settles with the consumer or third-party owner (p6).
The remaining regulations cover grid interconnection and metering standards (p5, p7), extension of solar RPO benefit to the licensee for eligible-consumer generation (p6–7), non-discriminatory open access with exemption from banking, wheeling and cross-subsidy charges (p7), REC eligibility (p7), compensation and penalty for metering failure (p8), and the Commission's powers to direct, remove difficulties and amend (p8).
Read with this
Proposed changes (drafts with no final yet)
Earlier drafts
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.