KSERC · Kerala State Electricity Regulatory Commission
Cross-subsidy Reduction Roadmap for Distribution Licensees Regulations, 2012
Kerala State Electricity Regulatory Commission (Principles for determination of roadmap for cross-subsidy reduction for Distribution Licensees) Regulations, 2012
RegulationDated 20 Nov 2012No. 751/CT/KSERC/2011 dated 20th November 2012
Summary
Summary written by software. Check the regulator's original before you rely on it.
On 20 November 2012 the Kerala State Electricity Regulatory Commission notified the KSERC (Principles for determination of roadmap for cross-subsidy reduction for Distribution Licensees) Regulations, 2012, under section 181 of the Electricity Act, 2003, and they came into force at once (p1). The regulations fix the principles the Commission will follow when designing retail tariffs for the State's distribution licensees, and the same principles are to guide licensees when they propose retail tariffs alongside their ARR filings (p5).
Regulation 2 defines the working vocabulary — cost of supply, subsidising and subsidised consumer categories, tariff shock, and cross subsidy as the gap between a category's applicable average tariff and the Commission's approved average cost of supply for the year (p1–2).
Regulation 3 carries the substance. It specifies how a category's average tariff is computed from billed amounts and sales, and how cost of supply is derived from the approved ARR divided by forecast energy sales, with that average-cost methodology to run for sixty months (or longer as the Commission decides) before moving to category-wise cost of supply under guidelines yet to be notified (p2). It then specifies how the ratio of average tariff to average cost of supply is to be raised for subsidised categories and lowered for subsidising ones, at a rate the Commission sets and holds fixed for the ARR period; requires licensees to segregate their accounts to capture network and supply costs so that the shift to category-wise cost of supply is possible after sixty months; lists the determinants the Commission must weigh, including the State Government's direct-subsidy funding needs and tariff shocks; requires the roadmap to be notified as a percentage of approved cost of supply, revisable if assumptions change and capable of differing between licensees; and reserves the Commission's liberty to deviate with reasons recorded in the tariff order (p2–4). Regulation 4 preserves the Commission's inherent powers and its ability to adopt a variant procedure, and Regulation 5 provides for removal of difficulties by order or on the licensee's application (p4). The Explanatory Note links the exercise to the Act, the National Electricity Policy and the Tariff Policy (p5).
Read with this
Procedures and orders made under it
Voltaic last read KSERC's website for final documents on 24 Nov 2026. A document KSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.