2 documents match “T-GNA corridor allocation”.
The state and topic filters do not apply to a word search yet; the regulator, document type and year filters do.
Draft Bihar Electricity Grid Code, 2026 — Consultative Paper
Draft- 8.8 Scheduling from Alternate Source of Power by a … › 8.9 Procedure for Scheduling and Despatch Timelines for …… schedules as requisitioned by STOA/T-GNA grantees can be granted based on available transmission capability after allocating corridors to the LTA /MTOA/GNA grantees. Provided that in case of constraint in transmission system, …
- 7.16 Periodic Testing › 8.5 General Provisions… under Open Access to In-STS regulations specified by the Commission or GNA or T-GNA, as the case may be. (i) Document in support of the grant of Open Access to In-STS, GNA,T-GNA or Connectivity, by the sellers and the buyers, as …
3 matching passages in this document
BSPTCL and SLDC comments on the Draft Bihar Electricity Grid Code Regulations, 2026
Draft- Annexure -1 › Chapter 8: SCHEDULING AND DESPATCH CODE… L-1/261/2021/CERC dated 29.09.2023 of approved NLDC procedure for allocation of transmission corridor for scheduling of GNA & T-GNA under CERC (Connectivity and GNA to the interstate transmission system) Reg. 2022. …
- Annexure -1 › Chapter 8: SCHEDULING AND DESPATCH CODE… SLDC shall issue final drawl schedules for STOA/T-GNA grantees by 9.30 AM of 'D-1' day. (iii) SLDC shall issue final drawl schedules for STOA/T-GNA grantees by 0945 hrs of 'D-1' day. …
3 matching passages in this document