Skip to content

BERC · Bihar Electricity Regulatory Commission

BSPTCL and SLDC comments on the Draft Bihar Electricity Grid Code Regulations, 2026

Comments/Suggestions of BSPTCL on the Draft BERC Grid Code Regulations

Comments received on a draftDated 25 Sep 2026158 dated 25.09.2026

Draft

Voltaic holds no final regulation made from this draft.

Comments received on the draft Bihar Electricity Grid Code, 2026 — Consultative Paper.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a compilation of two stakeholder responses to the Bihar Electricity Regulatory Commission's draft Bihar Electricity Grid Code Regulations, 2026 — it is not a regulation itself. Both come from Bihar State Power Transmission Company Limited, one from the STU side and one from the SLDC side, and both are addressed to the BERC Secretary (p1, p6).

The first submission (pp1–5), signed by the Chief Engineer (STU), makes five comments. It asks that the proposed Grid Code Review Panel be replaced by a Grid Coordination Committee constituted, notified and convened by the Commission, on the lines of the JSERC State Grid Code, 2008 (p1–2). It asks that the Operation Coordination Committee and Protection Coordination Committee be constituted by the Government of Bihar, Energy Department, rather than the review panel, citing the Electricity Act's provisions on RLDCs, SLDCs and directions by the appropriate government (p2–3). It seeks a lower signatory threshold for the COD conformity certificate, from CMD/CEO/MD to a Director/Senior Officer, citing the MERC precedent (p4). It asks for 132 kV to be added as a separate voltage class in the fault clearance time table with a 160 ms target (p4–5), and for annual internal protection audits for users connected at 220/132 kV (p5).

The second submission (pp6–15) is the SLDC's covering letter with Annexure-1, a clause-by-clause table. It covers scope and definitions in Chapter 1, seeking alignment of ATC, drawal schedule, BSEA, State Grid and User with CERC IEGC 2023 (pp7–8); Chapter 2 on OCC/PCC constitution, open access nodal agency and automatic meter reading (p9); Chapter 6 trial-run provisions for solar, wind and pumped storage, including aggregation and sub-5 MW open access projects, plus cross-reference corrections (pp10–11); Chapter 7 on demand estimation, outage planning and load-despatch training and certification (p12); and Chapter 8 scheduling and despatch timelines, TTC/ATC assessment horizon, connection agreements and compensation for bar operation (pp13–15). It closes by proposing an entirely new Metering Code chapter aligned with the CEA metering regulations (p15).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Technical standards

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document