Skip to content

BERC · Bihar Electricity Regulatory Commission

Draft Bihar Electricity Grid Code, 2026 — Consultative Paper

Bihar Electricity Regulatory Commission (Bihar Electricity Grid Code) Regulations, 2026

Draft regulationDated 7 Aug 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is BERC's consultative paper and accompanying draft Bihar Electricity Grid Code, 2026. The consultative paper (pp1–2) recalls that the Bihar Electricity Grid Code, 2010 came into effect on 20 July 2010 and describes the grid code as the primary legal and technical constitution for the State power sector. It lists the subject areas the existing code covers, notes CERC's Indian Electricity Grid Code Regulations, 2023 (notified 3 August 2023) and CERC Connectivity and General Network Access Regulations, 2022 (notified 9 October 2022, with three amendments), and explains that the draft is uploaded for comments. It invites comments/objections by 4.09.2026 and sets a hearing for 10.09.2026 at 11.30 AM (p2).

The draft regulations (from p3) are issued under the Electricity Act, 2003 and would be cited as the Bihar Electricity Regulatory Commission (Bihar Electricity Grid Code) Regulations, 2026. Chapter 1 (pp8–22) deals with short title, extent and commencement, supersession of the 2010 Code, application to Users, SLDC/ALDC, RE generators/parks and QCAs, and a long list of definitions. Chapter 2 (pp23–41) creates the Grid Code Review Panel, the Operation Coordination Committee and the Protection Coordination Committee, assigns roles to SLDC, ALDC, STU, transmission licensees, distribution licensees, Users and QCAs, and covers dispute settlement, IEGC compatibility and compliance monitoring.

The resource-planning, connection and protection chapters follow: Chapter 3 (pp42–43) requires integrated resource planning, demand forecasting, generation resource adequacy/procurement and transmission adequacy assessment, mainly through the BERC Resource Adequacy Regulations, 2025. Chapter 4 (pp44–48) specifies connection procedure, connectivity agreement, technical requirements and communication/data facilities. Chapter 5 (pp49–54) specifies protection protocol, settings, audit plans, system protection schemes and recording instruments. Chapter 6 (pp55–71) covers start-up power, infirm power, trial runs for thermal, hydro, solar, wind, ESS, pumped storage, hybrid and transmission elements, pre-COD documents/tests, trial-run certificates and commercial operation declarations.

Chapter 7 (pp72–115) is the operating code: operating philosophy, system security, frequency control, primary/secondary/tertiary reserves, control hierarchy, operational and outage planning, restoration, real-time operation, demand management and curtailment, post-despatch analysis, reports, reactive power management, periodic testing and capacity building. Chapter 8 (pp116–144) is the scheduling and despatch code, covering control-area jurisdiction, roles of SLDC, sellers and buyers, general scheduling provisions, load-generation balance, unit shutdown, alternate supply, day-ahead despatch timelines, metering/accounting and inspection. Chapter 9 (pp144–146) deals with cyber security; Chapter 10 (pp147–148) with monitoring and compliance through self-audit and independent third-party audit; Chapter 11 (pp149–150) with relaxation, difficulty removal, suo motu orders, repeal/savings and the statement that the regulations are not to be treated as Change in law in contracts. Annexures 1–6 (pp151–163) provide templates and procedures for site responsibility, third-party protection validation, procedures to be submitted to the Commission, reserve assessment and REGS data/forecasting/scheduling.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Ancillary services and reserves

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft.

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document