Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
2 documents match “storage drawal T-GNA”.
BSPTCL and SLDC comments on the Draft Bihar Electricity Grid Code Regulations, 2026
Draft- Annexure -1 › Chapter 8: SCHEDULING AND DESPATCH CODE… Real-time monitoring of the injection, drawal and deviation of the Sellers and Buyers; iii. Monitoring declared capacity, schedules and forecasts to ensure that no Grid Connected Entity indulges in gaming, iv. …
- Annexure -1 › Chapter 8: SCHEDULING AND DESPATCH CODE… and the drawal schedule of the buyer. Time format may kindly be made uniform in all clauses of the regulation 8.9. 8.9.1.r.(iii) (iii) SLDC shall issue final drawl schedules for STOA/T-GNA grantees by 9.30 AM of 'D-1' day. …
3 matching passages in this document
Draft Bihar Electricity Grid Code, 2026 — Consultative Paper
Draft- 8. Declaration of Declared Capacity by Intra State entity … › 12. Minimum turndown level for intra-State entity thermal …… or ESS or a drawee entity shall be allowed to schedule injection or drawal only up to its effective Intra State Open access quantum, GNA quantum and T-GNA quantum, as applicable, in accordance with the Intra State Open access …
- 2.Issuance of day-ahead schedule… intra state entities including the information received from RLDC for the GNA grantees and T-GNA grantees: (i) The ex-power plant schedule to each of the regional entity generating station and In-SGS, in MW for different time blocks …
3 matching passages in this document