Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
2 documents match “storage drawal T-GNA”.
The state and topic filters do not apply to a word search yet; the regulator, document type and year filters do.
State Grid Code (First Amendment) Regulations, 2026 — Statement of Reasons
- MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (STATE GRID … › 5.3 Provision in Final MERC (State Grid Code) (First …… WRLDC shall check if drawal schedules as requisitioned by drawee GNA grantees can be allowed based on available transmission capability: Provided that in case of constraint in transmission system, …
- MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (STATE GRID … › 5.3 Provision in Final MERC (State Grid Code) (First …… as the case may be, shall furnish time blockwise requisition for drawal to WRLDC for next day, in accordance with their contracts.
3 matching passages in this document
Proposed Amendments to Regulations for Implementation of the Maharashtra Renewable Energy and Energy Storage Policy, 2025-26 to 2035-36 — Explanatory Memorandum
Draft- 7.1. Draft MERC (Intra-State Transmission Connectivity and …… standalone Energy Storage Systems ("ESS") having a minimum injection or drawal capability of 5 MW, including through aggregation; Lead Generators or Lead ESS aggregators having an aggregate capacity of 5 MW and above; authorised …
- 7.1. Draft MERC (Intra-State Transmission Connectivity and …… the Draft Regulations prescribe minimum usable storage of 1 MWh per MW of sanctioned connectivity for applications granted up to the year 2030 and 2 MWh per MW for applications granted thereafter. …
3 matching passages in this document