Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
2 documents match “energy storage obligation”.
Madhya Pradesh Electricity Grid Code (Revision-III), 2024
1 amendment on Voltaic
- FREQUENCY AND VOLTAGE MANAGEMENT CODE › 10.5.2 Primary Control… Primary control is local automatic control in a generating unit or energy storage system or demand side resource for the purpose of adjusting its active power output or consumption, as the case may be, in response to frequency excursion. …
- CHAPTER 9 › SCHEDULE AND DESPATCH CODE… Hybrid of Wind and Solar Generating Stations and Energy Storage System (ESS) shall mandatorily provide to SLDC, in a format as specified by SLDC, the technical specifications of their plants at the beginning and whenever there is any …
3 matching passages in this document
Madhya Pradesh Electricity Grid Code (Revision-III), 2024 — First Amendment
Amends the Madhya Pradesh Electricity Grid Code (Revision-III), 2024
- Sub-Regulation 17.10.1 under Regulation 17.10 Data … › 5 Amendment to APPENDIX -K, of the Principal RegulationsAll the Inverter Based Resources (IBRs) covering wind, solar and energy storage shall ensure that they have the necessary capability, as per CEA Connectivity Standards, all the time including non-operating hours and night hours for solar. …
- Sub-Regulation 17.10.1 under Regulation 17.10 Data …… All concerned Intra-State entities (in whose premises the Special Energy Meters are installed) connected to STU network shall provide Automatic Meter Reading (AMR) facility for transmitting ABT meter data to SLDC remotely. …
3 matching passages in this document