MPERC · Madhya Pradesh Electricity Regulatory Commission
Madhya Pradesh Electricity Grid Code (Revision-III), 2024 — First Amendment
The Madhya Pradesh Electricity Grid Code (Revision-III) (First Amendment), 2024
AmendmentDated 19 Jun 2026MPERC / 2026 / 1024 dated 19.06.2026
Amends the Madhya Pradesh Electricity Grid Code (Revision-III), 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a notification of the Madhya Pradesh Electricity Regulatory Commission amending the Madhya Pradesh Electricity Grid Code (Revision-III), 2024. It is made under s.86(1)(h) of the Electricity Act, 2003, was issued on 19.06.2026, and takes effect from the date of publication in the State Gazette — no Gazette date is printed (p1). Clause 1 gives the short title, commencement and applicability (p1).
Clause 2 rewrites parts of Regulation 7 on generating station connection and commissioning (p1–3). It splits the infirm-power injection window into separate regimes for conventional stations and for renewable energy generating stations and energy storage systems, and it inserts a proviso allowing extension of that window — short extensions by SLDC/RLDC, longer ones by the Commission — with stated advance-notice requirements (p1–2). It restates how the trial-run period is counted, adds provisos allowing a hydro unit to declare COD when reservoir levels are insufficient (with a duty to demonstrate full capability later, or to repeat the trial run or de-rate), and substitutes the rule for when scheduling begins after the commercial operation date (p2–3).
Clause 3 amends Regulation 9 on scheduling and despatch (p3–6). It adds a proviso letting a s.62 generating station sell un-requisitioned surplus power in the day-ahead market without beneficiary consent, with gains shared per the PPA; shifts the time-block from which schedule revisions take effect; and inserts a new sub-clause restricting revisions of declared capacity and schedule to bilateral transactions, with separate daily and monthly revision ceilings for thermal/ESS entities and for hydro, and a provision for SLDC to allow upward revision for grid requirements (p3–4). It replaces the reference to a separately specified turndown-level mechanism with a named approved operating procedure, substitutes the tables used to compute compensation for heat-rate, auxiliary-consumption and start-up fuel degradation at part load, and adds clauses on additional secondary fuel oil, the generator/beneficiary sharing ratio, the exclusion of ancillary-services schedule changes, and SLDC's duty to prepare the compensation procedure for Commission approval (p4–6).
Clause 4 amends Regulation 17 on data collection, requiring intra-state entities on the STU network to provide automatic meter reading of ABT meter data to SLDC, with a fallback for manual download and certification, and extending a parallel AMR and data-passing obligation to Discom-embedded entities and inter-Discom interfaces (p6–7). Clause 5 substitutes the reactive-power-compensation clauses in Appendix-K, routing generator VArh charges to separate Commission orders and adding capability and treatment rules for inverter-based resources including wind, solar and storage (p7).
Read with this
The regulation
- Dated 13 Mar 2024Madhya Pradesh Electricity Grid Code (Revision-III), 2024
Procedures and orders made under it
Other copies of these documents (1)
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.