Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Madhya Pradesh Electricity Grid Code (Revision-III), 2024 — First Amendment

The Madhya Pradesh Electricity Grid Code (Revision-III) (First Amendment), 2024

AmendmentDated 19 Jun 2026MPERC / 2026 / 1024 dated 19.06.2026

Amends the Madhya Pradesh Electricity Grid Code (Revision-III), 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a notification of the Madhya Pradesh Electricity Regulatory Commission amending the Madhya Pradesh Electricity Grid Code (Revision-III), 2024. It is made under s.86(1)(h) of the Electricity Act, 2003, was issued on 19.06.2026, and takes effect from the date of publication in the State Gazette — no Gazette date is printed (p1). Clause 1 gives the short title, commencement and applicability (p1).

Clause 2 rewrites parts of Regulation 7 on generating station connection and commissioning (p1–3). It splits the infirm-power injection window into separate regimes for conventional stations and for renewable energy generating stations and energy storage systems, and it inserts a proviso allowing extension of that window — short extensions by SLDC/RLDC, longer ones by the Commission — with stated advance-notice requirements (p1–2). It restates how the trial-run period is counted, adds provisos allowing a hydro unit to declare COD when reservoir levels are insufficient (with a duty to demonstrate full capability later, or to repeat the trial run or de-rate), and substitutes the rule for when scheduling begins after the commercial operation date (p2–3).

Clause 3 amends Regulation 9 on scheduling and despatch (p3–6). It adds a proviso letting a s.62 generating station sell un-requisitioned surplus power in the day-ahead market without beneficiary consent, with gains shared per the PPA; shifts the time-block from which schedule revisions take effect; and inserts a new sub-clause restricting revisions of declared capacity and schedule to bilateral transactions, with separate daily and monthly revision ceilings for thermal/ESS entities and for hydro, and a provision for SLDC to allow upward revision for grid requirements (p3–4). It replaces the reference to a separately specified turndown-level mechanism with a named approved operating procedure, substitutes the tables used to compute compensation for heat-rate, auxiliary-consumption and start-up fuel degradation at part load, and adds clauses on additional secondary fuel oil, the generator/beneficiary sharing ratio, the exclusion of ancillary-services schedule changes, and SLDC's duty to prepare the compensation procedure for Commission approval (p4–6).

Clause 4 amends Regulation 17 on data collection, requiring intra-state entities on the STU network to provide automatic meter reading of ABT meter data to SLDC, with a fallback for manual download and certification, and extending a parallel AMR and data-passing obligation to Discom-embedded entities and inter-Discom interfaces (p6–7). Clause 5 substitutes the reactive-power-compensation clauses in Appendix-K, routing generator VArh charges to separate Commission orders and adding capability and treatment rules for inverter-based resources including wind, solar and storage (p7).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Metering

Read with this

Other copies of these documents (1)

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document