MPERC · Madhya Pradesh Electricity Regulatory Commission
Madhya Pradesh Electricity Grid Code (Revision-III), 2024
The Madhya Pradesh Electricity Grid Code (Revision- III), 2024
CodeDated 13 Mar 2024No. MPERC/2024/672 dated 13.03.2024
1 amendment to it is on Voltaic, dated 19 Jun 2026.
Summary
Summary written by software, from pages 1 to 29 of 165. Check the regulator's original before you rely on it.
The Madhya Pradesh Electricity Regulatory Commission (MPERC) notification dated 13 March 2024 specifies the Madhya Pradesh Electricity Grid Code (Revision-III), 2024, made under s.86(1)(h) of the Electricity Act 2003 (p1). The Code extends to the whole State and binds SLDC, STU, intra-State transmission licensees and every User connected to or using the intra-State transmission system; it enters into force from Gazette publication, though the Gazette date is not printed (p1).
Part I, General Code, opens with applicability, objectives and implementation. It states that the Code governs the STU-User boundary, protects grid stability, sets performance characteristics, and indicates generation scheduling and dispatch (pp1–2). Clause 1.2 lists the full seven-part architecture: Planning Code (resource adequacy, system planning, connection, system security, commissioning/COD), Load Despatch & System Operation Code, Protection Code, Metering Code, Cyber Security Code and Data Registration Code (pp2–4). The General Code also covers confidentiality, dispute settlement, communication protocols and publication on the Commission, SLDC and STU websites (pp5–6).
Chapter 2 is a definitions table running from p7 to p21, with 163 terms. It anchors terms such as User, EHV, EHV Consumer, REGS, SSGS, STU, SLDC, time block, ESS, RHGS, grid states (normal, alert, emergency, restorative) and cross-refers extensively to CEA, CERC, IEGC and MPERC instruments (pp7–21).
Chapter 3 creates the management framework. STU implements and enforces the Code; a Grid Code Review Committee, constituted by separate Commission order, proposes revisions and reports to the Commission (pp22–24). Functional committees — OCC, PCC and TMC — are to be constituted for system operation, protection and metering, with defined meeting frequencies and functions (pp24–26). Compliance is monitored by STU/SLDC; non-compliance, wrong capacity declarations and failure to follow SLDC directions can attract penalties, including up to Rs. five lakh for failure to comply with SLDC directions (pp26–27).
Part II begins at p28. Chapter 4 covers Resource Adequacy and System Planning. Demand forecasting and generation resource adequacy are deferred to MPERC's Framework for Resource Adequacy Regulations, 2024; STU assesses transmission resource adequacy (pp28–29). The System Planning Code sets STU's planning procedure, data submission by Users, consultation duties and non-discriminatory open access obligations under ss.39 and 40 (p29).
Read with this
Amendments and corrections
Procedures and orders made under it
Other copies of these documents (1)
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.